Log out
AA
First
Last
Back

Alex Greaves

Senior Project Engineer
Request to Book

Availability

Get in touch with us to get real-time availability for
Alex
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1760
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

13
years

Education

Chartered Professional Engineer in Civil and Structural Engineering

University ofNottingham, UK (2008-12) – Master in CivilEngineering

University of Melbourne(2010-11) Year Abroad(Upper 2nd Class/H2A)

Qualifications

BEng

Software Familiarity

MS Project

References

No items found.

Day Rate

$
1760
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

13
years

Recent Activity

About

Experienced Civil Engineer with over 12 years in the delivery of major infrastructure projects across the transport, rail, and utilities sectors. Currently working as a Senior Project Engineer, Alex has led key structural and building packages on the South Geelong to Waurn Ponds Duplication and Warrnambool Line Upgrade for Rail Projects Victoria, including programming and cost forecasting responsibilities. Previous roles include Senior and Project engineering positions at Fulton Hogan and CPB Contractors, where Alex successfully delivered complex works on high-profile projects such as the Robinsons Road Level Crossing Removal and WestGate Tunnel Project. With a strong background in structures, bridgeworks, CSR, ITS, and service relocations, as well as extensive stakeholder engagement experience, Alex brings a proven track record of leading multidisciplinary teams, managing budgets, and driving projects from early design through to construction completion.

• Project Delivery

• Safety Management

• Project Planning andControls

• Quality Assurance

• Commercial Acumen

• Problem Solving

Skills

Civil Engineering
Design manager
Engineering design
In ground services
Structural steel
FRP works

Alex

's Project Experience

Senior Project Engineer | Djilang Alliance – McConnell Dowell & DTI | 2021-Present

North Structures Senior Project Engineer responsible for all North Structures Scope includingthree span Fyans Street rail bridge (two 25m Super-T spans and 50m steel through girder),unique bridge installation methods using self-propelled modular transport (SPMT), minimisingrail occupation requirements and responsible for all miscellaneous steel and concretestructures (including retaining walls, steel gantries and culverts) whilst managing a team of upto 7 engineers.

Senior Project Engineer | Fulton Hogan – LXRA | 2020 – 2021

Successfully delivered the structures scope on a major infrastructure project, including a railbridge, retaining walls (bored piles, soil nails, and shotcrete), as well as various steel andconcrete structures. Led a team of six engineers, overseeing day-to-day operations and technicaldelivery. Played a key role in the development and continuous refinement of the structuresconstruction program, ensuring alignment and collaboration with other disciplines. Managedthe structures budget and cost forecasting to maintain financial control. Actively contributed todesign development and constructability reviews across all structure packages, frompreliminary design through to Issued for Construction (IFC) stage.

Project Engineer | CPB Contractors – West Gate Tunnel | 2018 - 2020

West Gate Tunnel Project for client Transurban, contributing to the delivery of a 1km-longelevated structure reaching heights of up to 25 metres, spanning multiple railway lines, CityLink,Footscray Road, and an electrical substation. Delivered key substructure components includingbored and driven piles, pile caps, and precast pier installations, along with complex steel strutinstallations into the existing CityLink bridge as part of a bridge widening scope. Managedservice investigations and relocations, while leading critical stakeholder engagement withentities such as CitiPower, CityLink, and multiple rail authorities.

Project Engineer | CPB Contractors – Multiple Projects | 2017 - 2018

Craigieburn Sewage Transfer Hub

project for client Yarra Valley Water, delivering structural steel elements includinghandrails, walkways, stairways, and access gates. Additionally, oversaw the installation of GRP covers for the inlet structure,ensuring compliance with safety, quality, and design requirements

CityLink Tulla Widening

Project from Bulla Road to Power Street for client Transurban, delivering the widening of a 1kmelevated section of the West Gate Freeway. Scope included steel strut installation, placement of precast trans floor panels,and construction of in situ deck involving 23 concrete deck pours. Also managed the demolition and replacement of 1km ofexisting parapets, ensuring minimal disruption to live traffic and adherence to strict safety and quality standards.

Site Engineer | Lendlease Engineering – CITY LINK | 2016 - 2017

Site Engineer on the CityLink Tulla Widening Project – Airport to Bulla Road for client VicRoads, within the ITS and utilitiesteam. Supported the delivery and coordination of Intelligent Transportation Systems and utility relocations, ensuringseamless integration with roadworks and adherence to project specifications, safety standards, and stakeholderexpectations.

Site Engineer | BMD - VICT | 2014 - 2016

Site Engineer on the Victoria International Container Terminal project for client VICT, overseeing key civil and structuralworks. Scope included installation of 54km of conduits and 420 precast pits, as well as crane rail construction involvingsleepers, ballast, and welded rail. Delivered a range of in-situ and precast concrete structures, and managed the drilling of2,500 controlled modulus columns, ensuring technical compliance, quality standards, and timely delivery across all workfronts.

Site Engineer| Fulton Hogan – M80 | 2012 - 2014

Site Engineer on the M80 Upgrade Project – Edgars Road to Plenty Road for client VicRoads, delivering bridge strengtheningand widening works on two existing structures. Also responsible for the construction of various ancillary structures, includingnoise walls, retaining walls, concrete barriers, and steel gantries, ensuring works were completed to specification, onschedule, and in coordination with live traffic conditions.

Availability

Get in touch with us to get real-time availability for
Alex
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1760
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

13
years

Education

Chartered Professional Engineer in Civil and Structural Engineering

University ofNottingham, UK (2008-12) – Master in CivilEngineering

University of Melbourne(2010-11) Year Abroad(Upper 2nd Class/H2A)

Qualifications

BEng

Software Familiarity

MS Project

References

No items found.

Day Rate

$
1760
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

13
years

Recent Activity

About

Experienced Civil Engineer with over 12 years in the delivery of major infrastructure projects across the transport, rail, and utilities sectors. Currently working as a Senior Project Engineer, Alex has led key structural and building packages on the South Geelong to Waurn Ponds Duplication and Warrnambool Line Upgrade for Rail Projects Victoria, including programming and cost forecasting responsibilities. Previous roles include Senior and Project engineering positions at Fulton Hogan and CPB Contractors, where Alex successfully delivered complex works on high-profile projects such as the Robinsons Road Level Crossing Removal and WestGate Tunnel Project. With a strong background in structures, bridgeworks, CSR, ITS, and service relocations, as well as extensive stakeholder engagement experience, Alex brings a proven track record of leading multidisciplinary teams, managing budgets, and driving projects from early design through to construction completion.

• Project Delivery

• Safety Management

• Project Planning andControls

• Quality Assurance

• Commercial Acumen

• Problem Solving

Skills

Civil Engineering
Design manager
Engineering design
In ground services
Structural steel
FRP works

Alex

's Project Experience

Senior Project Engineer | Djilang Alliance – McConnell Dowell & DTI | 2021-Present

North Structures Senior Project Engineer responsible for all North Structures Scope includingthree span Fyans Street rail bridge (two 25m Super-T spans and 50m steel through girder),unique bridge installation methods using self-propelled modular transport (SPMT), minimisingrail occupation requirements and responsible for all miscellaneous steel and concretestructures (including retaining walls, steel gantries and culverts) whilst managing a team of upto 7 engineers.

Senior Project Engineer | Fulton Hogan – LXRA | 2020 – 2021

Successfully delivered the structures scope on a major infrastructure project, including a railbridge, retaining walls (bored piles, soil nails, and shotcrete), as well as various steel andconcrete structures. Led a team of six engineers, overseeing day-to-day operations and technicaldelivery. Played a key role in the development and continuous refinement of the structuresconstruction program, ensuring alignment and collaboration with other disciplines. Managedthe structures budget and cost forecasting to maintain financial control. Actively contributed todesign development and constructability reviews across all structure packages, frompreliminary design through to Issued for Construction (IFC) stage.

Project Engineer | CPB Contractors – West Gate Tunnel | 2018 - 2020

West Gate Tunnel Project for client Transurban, contributing to the delivery of a 1km-longelevated structure reaching heights of up to 25 metres, spanning multiple railway lines, CityLink,Footscray Road, and an electrical substation. Delivered key substructure components includingbored and driven piles, pile caps, and precast pier installations, along with complex steel strutinstallations into the existing CityLink bridge as part of a bridge widening scope. Managedservice investigations and relocations, while leading critical stakeholder engagement withentities such as CitiPower, CityLink, and multiple rail authorities.

Project Engineer | CPB Contractors – Multiple Projects | 2017 - 2018

Craigieburn Sewage Transfer Hub

project for client Yarra Valley Water, delivering structural steel elements includinghandrails, walkways, stairways, and access gates. Additionally, oversaw the installation of GRP covers for the inlet structure,ensuring compliance with safety, quality, and design requirements

CityLink Tulla Widening

Project from Bulla Road to Power Street for client Transurban, delivering the widening of a 1kmelevated section of the West Gate Freeway. Scope included steel strut installation, placement of precast trans floor panels,and construction of in situ deck involving 23 concrete deck pours. Also managed the demolition and replacement of 1km ofexisting parapets, ensuring minimal disruption to live traffic and adherence to strict safety and quality standards.

Site Engineer | Lendlease Engineering – CITY LINK | 2016 - 2017

Site Engineer on the CityLink Tulla Widening Project – Airport to Bulla Road for client VicRoads, within the ITS and utilitiesteam. Supported the delivery and coordination of Intelligent Transportation Systems and utility relocations, ensuringseamless integration with roadworks and adherence to project specifications, safety standards, and stakeholderexpectations.

Site Engineer | BMD - VICT | 2014 - 2016

Site Engineer on the Victoria International Container Terminal project for client VICT, overseeing key civil and structuralworks. Scope included installation of 54km of conduits and 420 precast pits, as well as crane rail construction involvingsleepers, ballast, and welded rail. Delivered a range of in-situ and precast concrete structures, and managed the drilling of2,500 controlled modulus columns, ensuring technical compliance, quality standards, and timely delivery across all workfronts.

Site Engineer| Fulton Hogan – M80 | 2012 - 2014

Site Engineer on the M80 Upgrade Project – Edgars Road to Plenty Road for client VicRoads, delivering bridge strengtheningand widening works on two existing structures. Also responsible for the construction of various ancillary structures, includingnoise walls, retaining walls, concrete barriers, and steel gantries, ensuring works were completed to specification, onschedule, and in coordination with live traffic conditions.