Availability

Get in touch with us to get real-time availability for
Bradd
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1400
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

8
years

Education

RMIT | Bachelor of Engineering

Civil and Infrastructure (Honours) – 2016

Associate Civil Engineering Degree - 2014

Chisholm Institute

Diploma of Project Management - 2020

Qualifications & Affiliations

  • National Engineers Registration (NER)
  • Registered Professional Engineer (RPEng)
  • Registered Professional Engineer of
  • Queensland (RPEQ – 27379)
  • Rail Industry Worker Card
  • Intermediate Rigging
  • Advanced Scaffolding
  • Forklift License
  • Heavy Combination License\
  • Slewing Mobile Crane up to 60T
  • Construction White Card – 2009

Qualifications

BEng
Rail Industry Worker
RPENG
RPEQ
NER

Software Familiarity

AutoCAD
Aconex
Bluebeam
MS Project

References

Paul Dally
Rail Systems Manager
Laing O'Rourke
Verified on
Omaid Kohn
Construction Manager
Acciona
Verified on

Day Rate

$
1400
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

8
years

Recent Activity

  • Completed works on Coolstore Rd LXR Nov 2024
  • Repeat engagements on SEPA projects since Jan 2024

About

I am a civil engineer with 8 years experience within the tier one contractor space delivering some of Victoria’s major rail infrastructure projects. These include the Melbourne Metro Tunnel Project within the Rail Infrastructure Alliance (RIA), the Caulfield to Dandenong Level Crossing Removal Project (CTD) and most recently the South East Program Alliance (SEPA). Through working across numerous construction disciplines to implement various PCBU Management Systems, and having worked across multiple alliances, I have gained valuable skills in both civil, rail, and commercial aspects of complex project delivery.

My time at SEPA will come to a close mid November 2024. This is a contract role within the rail systems team through Laing O Rourke. Initially this was a supporting role for a 90 day occupation to remove the Union & Mont Albert Rd (UMA) level crossings. In the role of a project engineer delivering the Combined Services Route (CSR). This role saw the successful removal of 2 level crossings, planning & delivery of brownfield local CSR routes along a 3-track corridor spanning 3km with 1km of concrete base slab and the commissioning of a new substation.

Upon completion of UMA I transitioned into the Croydon level crossing project within SEPA. Over the course of 18 months, I planned & delivered the OHLE enabling scope across multiple occupations to facilitate the major civil structural campaign. This included a piling campaign, overhead structure install & the slewing of overhead wiring with a budget of $1.1 million. I transitioned back into CSR team to lead the delivery of the enabling & permanent cutover of the CSR & Victrack backbone. Approx 1.6km of trenching & boring through a brownfield environment with key dates to meet, ensuring the critical path program was maintained with an overall budget of $6 million.

Having previous experience in track delivery, my role evolved into a track PE to successfully deliver the track construction in the major commissioning occupation to remove the Coolstore Rd level crossing. This scope included 1.6km of ballast track through an elevated viaduct U-trough and the construction of a Hi-Rail access pad including bulk earthworks, track formation and drainage.

I am currently the lead rail systems engineer with a team of engineers under my guidance, reporting to a rail systems manager. Responsible for the all rail systems defect & punch list items and completion documentation closeout across 4 level crossing projects recently removed by SEPA. Prior to SEPA, I contracted to Seymour Whyte directly on an MRPV project as the Utility lead in the South East suburbs of Melbourne, managing the construction phase of the utility relocation scope for 5km worth of new road alignment. Approximate value of the utility scope was circa $10million split across telecom, water and power relocations to enable the major earthworks scope.

Outside of the infrastructure space, I am engaged with a commercial developer. I manage the civil operations for commercial projects ranging from $1 - $5 million, this includes engineering construction methodologies and procurement phase with the ability to manage civil & FRP scopes of works which include but are not limited to; footings, structural steel, precast panel installation and pavement scopes. Leaning on my previous bulk earthworks, FRP (Form Reo Pour) and structures experience with solid 5 year tenure at CPB in delivery.

Skills

Bulk excavation
FRP works
Earthworks
Structural steel
Piling
In ground services
Demolition
Pavements / shared user path
Retaining walls / systems
Hard landscaping
Soft landscaping
Cost Estimating & Tendering
Civil Engineering
Building Construction
Staging & Methodology

Bradd

's Project Experience

Project Engineer (Subcontract) | Jan 2023 - present

Laing O’Rourke – South East Program Alliance | $900 million
Level Crossing Removal Authority | LXRA

Role:
Project Engineer (Rail Systems) – Laing O Rourke
CSR – Responsible for $6 million Including material supply
OHLE – Responsible for $6.6 million excluding MTM material supply
Track - Responsible for $5 million excluding MTM material supply

Project description:

Mont Albert Rd & Union Rd level crossing removal, Surrey Hills in Victora

  • 3km of new ballast track in a Tri-track corridor with an approx. 1km of open cut trench base slab with capping beam and shotcrete walls.

Coolstore Rd level crossing removal, Croydon in Victoria

  • 1.5km of new ballast track in twin a track corridor with an approx. 900mm elevated viaduct structure.
  • Hi-rail access pad with compound area, landscaping and security fencing.

Responsibilities:

Month end reporting

  • Self-performed delivery
  • Approx 2.5km of Combined Service Route (CSR) trenching & boring
  • 1.8km of Ballast track construction including within a U-trough / viaduct environment
  • Overhead piling, structure / gantry erection, overhead wire running
  • Subcontracted lump sum scope of works
  • Subcontract material supply
  • Month end claims & assessment
  • Forecasting & time phasing expenditure

Planning & multidiscipline interface construction

  • Leading a team of project / site / graduate engineers
  • 12 & 6 week Lookaheads with other discipline leadsOccupation planning
  • Resource planning
  • Procurement (short & long lead items)

Design Review

  • Assisting in all stages of design review process - FD to IFC, DCN & RFI change notices

Quality

  • Managing the construction phase of QA documentation within a team environment
  • Lot creation, storing of documentation & closeout of quality lots
  • Identifying punch list items with stakeholders and actioning a strategy to close out all items in an agreed time period for client satisfaction.

Utility Lead (Subcontract) | Jun 2022 - Jan 2023

Seymour Whyte – Healsville Koo Wee Rup Rd Upgrade | $150 million
Major Roads Projects Victoria | (Seymour Whyte & Aurecon)

Role:
Utility Lead– Seymour Whyte

Project description:

  • 5km of road duplication, utility relocation, roundabout & road construction etc.
  • All brownfield works

Responsibilities:

Managing multiple subcontractors with $3-5million+ worth of individual subcontract works

  • Design
  • Supply & install

Coordination of multiple service relocating contractors along a 5km alignment including:

  • Horizontal drilling under major roads
  • Facilitation of new overhead poles / conductor wires
  • Install of high voltage underground power & AS3000 property connections to residential and commercial businesses
  • 5km of new South East Water watermain and property connections
  • 5km of new Telstra main feeds and property connections
  • Traffic management along a major arterial road ensuring minimal disruption is achieved

Reviewing variations and minimising scope growth by efficient construction methodology
Design review / design change management
Reporting to Major Roads Project Victoria (MRPV)
Stakeholder engagement

  • Network operators
  • Telstra (Telcom)
  • South East Water
  • Ausnet (Power)
  • Department of Environment, Land, Water and Planning
  • Local council / local residents

Project Engineer (Subcontract) Jan 2022 - Apr 2022

McConnell Dowell - Cranbourne Line Upgrade: Western Program Alliance | $1b
Rail Projects Victoria | McConnell Dowell, ARUP, Mott MacDonald

Role:
Project Engineer – McConnell Dowell

Project description:

  • 5.5km of track duplication, duplication of two existing rail bridges (Abbots Rd & Eumemmerring Creek) and the removal of the Greens Road level crossing in Dandenong utilising the U-trough methodology.

Responsibilities:

Working in with the track team, I was the senior engineering resource for the track discipline during the nightshift period on the 30-day commissioning occupation. Coordinating resources, reporting on planned vs actuals with mitigation strategies. Liaising with the occupation team planners of remaining scope and coordinating with other work groups. Post occupation I lead a small team to close out all track QA to meet tight deadlines as the commissioning event was linked to a major separable portion as part of the overall rail systems scope.

Civil Lead (Subcontract) | May 2021 – Present

Conform Developments – Multiple Projects

Role: Civil Lead - Conform Developments

Project description:

  • New Build – Warrnambool BP Service Station $4.4million - Complete
  • New Build – Korumburra 5no. Commercial Factories $3million
  • Knock Down Rebuild – Trafalgar BP Service Station $1million - Complete
  • New Build – Sandgate, Brisbane BP Service Station $4million - Complete
  • New Build – Morayfield, Brisbane Shell Service Station $4million

Responsibilities:

My role at Conform Developments is multifaceted and diverse. Key to this role is critical planning with various subcontractors working across multiple sites concurrently. Understanding suitable current market constraints and availability of materials in relation to procurement long lead items to ensure there is no delay on the overall construction program of the commercial build.

When not on site, my role involves; reviewing upcoming works and engaging with stakeholders to ensure works are carried out in accordance with relevant guidelines and standards. I successfully delivered a knock down and rebuild of precast building adjacent to a V-line rail corridor and a high voltage asset within close proximity of the build.Leaning on all previous experience to carefully plan all works in accordance with V-line, Vic Track and Ausnet’s stringent permit requirements.

When delivering a scope of works package, I am on site to manage/supervise works to ensure high standards are maintained and a quality product is achieved. In the event of missing information or constructability is not achievable, I’m able to lean on my first principles knowledge to come up with alternative solutions with the collaboration of experienced subcontractors and communicate this back to the design engineers for approval.

Site Engineer | Jan 2019 - Apr 2021

CPB Contractors

Melbourne Metro Tunnel Project: Rail Infrastructure Alliance | $1b Rail Projects Victoria | Alliance (CPB, John Holland and AECOM)

Role: Site Engineer - CPB Contractors

  • Cut & cover bulk earthworks & shotcrete retaining walls
  • FRP structures
  • Tunnel waterproofing

Project description:

  • The project involved the construction of the tunnel entrances at South Yarra and Kensington, as well as platform upgrades at West Footscray and various infrastructure upgrades along the Sunbury line. The SouthYarra tunnel entrance known as the “Eastern Portal’ is a top down (Cut & Cover) construction method which is where I spent most of my time on the project.
  • Upon practical completion of the Eastern Portal tunnel scope, I was re-deployed to the Gap Rd level crossing removal project bid team & early works for Sunbury.

Graduate Engineer | Sept 2016 – Jan 2019

CPB Contractors

Level Crossing Removal Project: Caulfield to Dandenong | $1.6bLevel Crossing Removal Authority | Alliance (CPB, Lendlease and WSP)

Role: Graduate Engineer - CPB Contractors

Project description:

  • The project involved the removal of 9 level crossing along the Cranbourne-Pakenham Line by elevated structures whilst rebuilding five stations.
  • The track was constructed using an Australian first precast concrete plinth systems which is used across all elevated structures.

Availability

Get in touch with us to get real-time availability for
Bradd
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1400
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

8
years

Education

RMIT | Bachelor of Engineering

Civil and Infrastructure (Honours) – 2016

Associate Civil Engineering Degree - 2014

Chisholm Institute

Diploma of Project Management - 2020

Qualifications & Affiliations

  • National Engineers Registration (NER)
  • Registered Professional Engineer (RPEng)
  • Registered Professional Engineer of
  • Queensland (RPEQ – 27379)
  • Rail Industry Worker Card
  • Intermediate Rigging
  • Advanced Scaffolding
  • Forklift License
  • Heavy Combination License\
  • Slewing Mobile Crane up to 60T
  • Construction White Card – 2009

Qualifications

BEng
Rail Industry Worker
RPENG
RPEQ
NER

Software Familiarity

AutoCAD
Aconex
Bluebeam
MS Project

References

Paul Dally
Rail Systems Manager
Laing O'Rourke
Verified on
Omaid Kohn
Construction Manager
Acciona
Verified on

Day Rate

$
1400
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

8
years

Recent Activity

  • Completed works on Coolstore Rd LXR Nov 2024
  • Repeat engagements on SEPA projects since Jan 2024

About

I am a civil engineer with 8 years experience within the tier one contractor space delivering some of Victoria’s major rail infrastructure projects. These include the Melbourne Metro Tunnel Project within the Rail Infrastructure Alliance (RIA), the Caulfield to Dandenong Level Crossing Removal Project (CTD) and most recently the South East Program Alliance (SEPA). Through working across numerous construction disciplines to implement various PCBU Management Systems, and having worked across multiple alliances, I have gained valuable skills in both civil, rail, and commercial aspects of complex project delivery.

My time at SEPA will come to a close mid November 2024. This is a contract role within the rail systems team through Laing O Rourke. Initially this was a supporting role for a 90 day occupation to remove the Union & Mont Albert Rd (UMA) level crossings. In the role of a project engineer delivering the Combined Services Route (CSR). This role saw the successful removal of 2 level crossings, planning & delivery of brownfield local CSR routes along a 3-track corridor spanning 3km with 1km of concrete base slab and the commissioning of a new substation.

Upon completion of UMA I transitioned into the Croydon level crossing project within SEPA. Over the course of 18 months, I planned & delivered the OHLE enabling scope across multiple occupations to facilitate the major civil structural campaign. This included a piling campaign, overhead structure install & the slewing of overhead wiring with a budget of $1.1 million. I transitioned back into CSR team to lead the delivery of the enabling & permanent cutover of the CSR & Victrack backbone. Approx 1.6km of trenching & boring through a brownfield environment with key dates to meet, ensuring the critical path program was maintained with an overall budget of $6 million.

Having previous experience in track delivery, my role evolved into a track PE to successfully deliver the track construction in the major commissioning occupation to remove the Coolstore Rd level crossing. This scope included 1.6km of ballast track through an elevated viaduct U-trough and the construction of a Hi-Rail access pad including bulk earthworks, track formation and drainage.

I am currently the lead rail systems engineer with a team of engineers under my guidance, reporting to a rail systems manager. Responsible for the all rail systems defect & punch list items and completion documentation closeout across 4 level crossing projects recently removed by SEPA. Prior to SEPA, I contracted to Seymour Whyte directly on an MRPV project as the Utility lead in the South East suburbs of Melbourne, managing the construction phase of the utility relocation scope for 5km worth of new road alignment. Approximate value of the utility scope was circa $10million split across telecom, water and power relocations to enable the major earthworks scope.

Outside of the infrastructure space, I am engaged with a commercial developer. I manage the civil operations for commercial projects ranging from $1 - $5 million, this includes engineering construction methodologies and procurement phase with the ability to manage civil & FRP scopes of works which include but are not limited to; footings, structural steel, precast panel installation and pavement scopes. Leaning on my previous bulk earthworks, FRP (Form Reo Pour) and structures experience with solid 5 year tenure at CPB in delivery.

Skills

Bulk excavation
FRP works
Earthworks
Structural steel
Piling
In ground services
Demolition
Pavements / shared user path
Retaining walls / systems
Hard landscaping
Soft landscaping
Cost Estimating & Tendering
Civil Engineering
Building Construction
Staging & Methodology

Bradd

's Project Experience

Project Engineer (Subcontract) | Jan 2023 - present

Laing O’Rourke – South East Program Alliance | $900 million
Level Crossing Removal Authority | LXRA

Role:
Project Engineer (Rail Systems) – Laing O Rourke
CSR – Responsible for $6 million Including material supply
OHLE – Responsible for $6.6 million excluding MTM material supply
Track - Responsible for $5 million excluding MTM material supply

Project description:

Mont Albert Rd & Union Rd level crossing removal, Surrey Hills in Victora

  • 3km of new ballast track in a Tri-track corridor with an approx. 1km of open cut trench base slab with capping beam and shotcrete walls.

Coolstore Rd level crossing removal, Croydon in Victoria

  • 1.5km of new ballast track in twin a track corridor with an approx. 900mm elevated viaduct structure.
  • Hi-rail access pad with compound area, landscaping and security fencing.

Responsibilities:

Month end reporting

  • Self-performed delivery
  • Approx 2.5km of Combined Service Route (CSR) trenching & boring
  • 1.8km of Ballast track construction including within a U-trough / viaduct environment
  • Overhead piling, structure / gantry erection, overhead wire running
  • Subcontracted lump sum scope of works
  • Subcontract material supply
  • Month end claims & assessment
  • Forecasting & time phasing expenditure

Planning & multidiscipline interface construction

  • Leading a team of project / site / graduate engineers
  • 12 & 6 week Lookaheads with other discipline leadsOccupation planning
  • Resource planning
  • Procurement (short & long lead items)

Design Review

  • Assisting in all stages of design review process - FD to IFC, DCN & RFI change notices

Quality

  • Managing the construction phase of QA documentation within a team environment
  • Lot creation, storing of documentation & closeout of quality lots
  • Identifying punch list items with stakeholders and actioning a strategy to close out all items in an agreed time period for client satisfaction.

Utility Lead (Subcontract) | Jun 2022 - Jan 2023

Seymour Whyte – Healsville Koo Wee Rup Rd Upgrade | $150 million
Major Roads Projects Victoria | (Seymour Whyte & Aurecon)

Role:
Utility Lead– Seymour Whyte

Project description:

  • 5km of road duplication, utility relocation, roundabout & road construction etc.
  • All brownfield works

Responsibilities:

Managing multiple subcontractors with $3-5million+ worth of individual subcontract works

  • Design
  • Supply & install

Coordination of multiple service relocating contractors along a 5km alignment including:

  • Horizontal drilling under major roads
  • Facilitation of new overhead poles / conductor wires
  • Install of high voltage underground power & AS3000 property connections to residential and commercial businesses
  • 5km of new South East Water watermain and property connections
  • 5km of new Telstra main feeds and property connections
  • Traffic management along a major arterial road ensuring minimal disruption is achieved

Reviewing variations and minimising scope growth by efficient construction methodology
Design review / design change management
Reporting to Major Roads Project Victoria (MRPV)
Stakeholder engagement

  • Network operators
  • Telstra (Telcom)
  • South East Water
  • Ausnet (Power)
  • Department of Environment, Land, Water and Planning
  • Local council / local residents

Project Engineer (Subcontract) Jan 2022 - Apr 2022

McConnell Dowell - Cranbourne Line Upgrade: Western Program Alliance | $1b
Rail Projects Victoria | McConnell Dowell, ARUP, Mott MacDonald

Role:
Project Engineer – McConnell Dowell

Project description:

  • 5.5km of track duplication, duplication of two existing rail bridges (Abbots Rd & Eumemmerring Creek) and the removal of the Greens Road level crossing in Dandenong utilising the U-trough methodology.

Responsibilities:

Working in with the track team, I was the senior engineering resource for the track discipline during the nightshift period on the 30-day commissioning occupation. Coordinating resources, reporting on planned vs actuals with mitigation strategies. Liaising with the occupation team planners of remaining scope and coordinating with other work groups. Post occupation I lead a small team to close out all track QA to meet tight deadlines as the commissioning event was linked to a major separable portion as part of the overall rail systems scope.

Civil Lead (Subcontract) | May 2021 – Present

Conform Developments – Multiple Projects

Role: Civil Lead - Conform Developments

Project description:

  • New Build – Warrnambool BP Service Station $4.4million - Complete
  • New Build – Korumburra 5no. Commercial Factories $3million
  • Knock Down Rebuild – Trafalgar BP Service Station $1million - Complete
  • New Build – Sandgate, Brisbane BP Service Station $4million - Complete
  • New Build – Morayfield, Brisbane Shell Service Station $4million

Responsibilities:

My role at Conform Developments is multifaceted and diverse. Key to this role is critical planning with various subcontractors working across multiple sites concurrently. Understanding suitable current market constraints and availability of materials in relation to procurement long lead items to ensure there is no delay on the overall construction program of the commercial build.

When not on site, my role involves; reviewing upcoming works and engaging with stakeholders to ensure works are carried out in accordance with relevant guidelines and standards. I successfully delivered a knock down and rebuild of precast building adjacent to a V-line rail corridor and a high voltage asset within close proximity of the build.Leaning on all previous experience to carefully plan all works in accordance with V-line, Vic Track and Ausnet’s stringent permit requirements.

When delivering a scope of works package, I am on site to manage/supervise works to ensure high standards are maintained and a quality product is achieved. In the event of missing information or constructability is not achievable, I’m able to lean on my first principles knowledge to come up with alternative solutions with the collaboration of experienced subcontractors and communicate this back to the design engineers for approval.

Site Engineer | Jan 2019 - Apr 2021

CPB Contractors

Melbourne Metro Tunnel Project: Rail Infrastructure Alliance | $1b Rail Projects Victoria | Alliance (CPB, John Holland and AECOM)

Role: Site Engineer - CPB Contractors

  • Cut & cover bulk earthworks & shotcrete retaining walls
  • FRP structures
  • Tunnel waterproofing

Project description:

  • The project involved the construction of the tunnel entrances at South Yarra and Kensington, as well as platform upgrades at West Footscray and various infrastructure upgrades along the Sunbury line. The SouthYarra tunnel entrance known as the “Eastern Portal’ is a top down (Cut & Cover) construction method which is where I spent most of my time on the project.
  • Upon practical completion of the Eastern Portal tunnel scope, I was re-deployed to the Gap Rd level crossing removal project bid team & early works for Sunbury.

Graduate Engineer | Sept 2016 – Jan 2019

CPB Contractors

Level Crossing Removal Project: Caulfield to Dandenong | $1.6bLevel Crossing Removal Authority | Alliance (CPB, Lendlease and WSP)

Role: Graduate Engineer - CPB Contractors

Project description:

  • The project involved the removal of 9 level crossing along the Cranbourne-Pakenham Line by elevated structures whilst rebuilding five stations.
  • The track was constructed using an Australian first precast concrete plinth systems which is used across all elevated structures.