Log out
AA
First
Last
Back

Enda Fowley

Project Engineer
Request to Book

Availability

Get in touch with us to get real-time availability for
Enda
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1260
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

6
years

Education

2016-2017 Master of Engineering in Energy Engineering (Honours)
National University of Ireland, Galway
Honours Thesis: “To Analyse Fatigue in a Composite Wind Turbine Blade”
Grade: 1st Class Honours

2012-2016 Bachelor of Engineering in Energy Engineering (Honours)
Galway Mayo Institute of Technology
Honours Thesis: “To develop a More Efficient Wind Turbine
Tower Envelope”
Grade: 1st Class Honours

Qualifications

Rail Industry Worker
CPEng

Software Familiarity

AutoCAD
Bluebeam

References

Dan Cole
Project Manager
SEPA
Verified on
November 29, 2024
Sophie Stone
Construction Manager
Dublin Road LXR
Verified on
October 31, 2024

Day Rate

$
1260
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

6
years

Recent Activity

  • Transferred onto the Completions Team at SEPA beginning November 2024
  • Extended on Dublin Road LXR for 4 months ending November 2024
  • Booked on Dublin Road LXR for 3 months beginning May 2024 as a Site Engineer

About

Project engineer with 6+ years of experience in commercial projects across international markets with proven leadership, communication and interpersonal skills. I worked in New York city for the last 6 years before moving to Melbourne January 2024. Experienced in project management, business development and team establishment.

Skills

  • Time Management
  • Cost Estimating
  • Self-Motivated
  • Contract Management
  • Priority Management
  • Business Development

Skills

Bulk excavation
FRP works
Earthworks
Structural steel
In ground services
Pavements / shared user path
Retaining walls / systems
Tactiles and linemarking
Hoarding
Hard landscaping
Soft landscaping
Design coordinator
Civil Engineering
Staging & Methodology

Enda

's Project Experience

Site Engineer | May2024 - Present

SEPA (Laing O'Rourke) Dublin Rd LXR 

Site Engineer seconded to the Dublin Rd LXR project

  • Stations package
  • Civils package

Addvance Construction Inc | 08/20 – 12/23

Site Engineer / Project Manager

  • Managed proposals and change orders
  • Estimated concrete, excavation, masonry, and Fireproofing for various general contractors.
  • Pre-pour checks ensuring reinforcement design and schedule was strictly adhered to.
  • Booking deliveries with main contractor.
  • As built surveys, overseeing testing, commissioning and handover of completed drainage and utilities.
  • Coordinated schedules with site supers & PM’s.
  • Ordered Concrete and rebar for multiple NY projects.

HES Civil | 11/17 - 07/20

Site Engineer

Groundworks and utilities of a six storey residential apartment block at Hansfield, Barnwell Point, Co Dublin.

Setting out all elements of substructure, drainage and utilities

  • Substructure: Piles, pile cap locations and ground beams.
  • Drainage: Foul and Storm
  • Utilities: Eir, Virgin Media, ESB and Watermain to Irish Water specification.
  • Pre-pour checks ensuring reinforcement design and schedule was strictly adhered to, checking pop up locations, box outs, cast in items etc.
  • Ensuring drawings issued were sufficient and accurate in order for works to proceed unhindered.
  • Co-ordinating and reformatting construction issue CAD drawings for upload to Leica Icon total station.
  • Supervising and checking work of a junior engineer.
  • Liaising with main contractor to determine location of existing services.
  • Coordinating works and ensuring materials required were delivered to site in a timely manner.
  • Booking deliveries with main contractor.
  • Record keeping, QA documentation, site diaries and ensuring all works were photographed and filed away.
  • Keeping accurate records to present to the commercial team to assist with monthly evaluations.
  • As built surveys, overseeing testing, commissioning and handover of completed drainage and utilities.
  • Setting out fowl and storm drainage on site.

Availability

Get in touch with us to get real-time availability for
Enda
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1260
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

6
years

Education

2016-2017 Master of Engineering in Energy Engineering (Honours)
National University of Ireland, Galway
Honours Thesis: “To Analyse Fatigue in a Composite Wind Turbine Blade”
Grade: 1st Class Honours

2012-2016 Bachelor of Engineering in Energy Engineering (Honours)
Galway Mayo Institute of Technology
Honours Thesis: “To develop a More Efficient Wind Turbine
Tower Envelope”
Grade: 1st Class Honours

Qualifications

Rail Industry Worker
CPEng

Software Familiarity

AutoCAD
Bluebeam

References

Dan Cole
Project Manager
SEPA
Verified on
November 29, 2024
Sophie Stone
Construction Manager
Dublin Road LXR
Verified on
October 31, 2024

Day Rate

$
1260
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

6
years

Recent Activity

  • Transferred onto the Completions Team at SEPA beginning November 2024
  • Extended on Dublin Road LXR for 4 months ending November 2024
  • Booked on Dublin Road LXR for 3 months beginning May 2024 as a Site Engineer

About

Project engineer with 6+ years of experience in commercial projects across international markets with proven leadership, communication and interpersonal skills. I worked in New York city for the last 6 years before moving to Melbourne January 2024. Experienced in project management, business development and team establishment.

Skills

  • Time Management
  • Cost Estimating
  • Self-Motivated
  • Contract Management
  • Priority Management
  • Business Development

Skills

Bulk excavation
FRP works
Earthworks
Structural steel
In ground services
Pavements / shared user path
Retaining walls / systems
Tactiles and linemarking
Hoarding
Hard landscaping
Soft landscaping
Design coordinator
Civil Engineering
Staging & Methodology

Enda

's Project Experience

Site Engineer | May2024 - Present

SEPA (Laing O'Rourke) Dublin Rd LXR 

Site Engineer seconded to the Dublin Rd LXR project

  • Stations package
  • Civils package

Addvance Construction Inc | 08/20 – 12/23

Site Engineer / Project Manager

  • Managed proposals and change orders
  • Estimated concrete, excavation, masonry, and Fireproofing for various general contractors.
  • Pre-pour checks ensuring reinforcement design and schedule was strictly adhered to.
  • Booking deliveries with main contractor.
  • As built surveys, overseeing testing, commissioning and handover of completed drainage and utilities.
  • Coordinated schedules with site supers & PM’s.
  • Ordered Concrete and rebar for multiple NY projects.

HES Civil | 11/17 - 07/20

Site Engineer

Groundworks and utilities of a six storey residential apartment block at Hansfield, Barnwell Point, Co Dublin.

Setting out all elements of substructure, drainage and utilities

  • Substructure: Piles, pile cap locations and ground beams.
  • Drainage: Foul and Storm
  • Utilities: Eir, Virgin Media, ESB and Watermain to Irish Water specification.
  • Pre-pour checks ensuring reinforcement design and schedule was strictly adhered to, checking pop up locations, box outs, cast in items etc.
  • Ensuring drawings issued were sufficient and accurate in order for works to proceed unhindered.
  • Co-ordinating and reformatting construction issue CAD drawings for upload to Leica Icon total station.
  • Supervising and checking work of a junior engineer.
  • Liaising with main contractor to determine location of existing services.
  • Coordinating works and ensuring materials required were delivered to site in a timely manner.
  • Booking deliveries with main contractor.
  • Record keeping, QA documentation, site diaries and ensuring all works were photographed and filed away.
  • Keeping accurate records to present to the commercial team to assist with monthly evaluations.
  • As built surveys, overseeing testing, commissioning and handover of completed drainage and utilities.
  • Setting out fowl and storm drainage on site.