Log out
AA
First
Last
Back

Marty Kannambra

Project Engineer
Request to Book

Availability

Get in touch with us to get real-time availability for
Marty
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1540
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

7
years

Education

Melbourne University

Bachelor of (Civil Systems) Science & Master of (Civil) Engineering

Qualifications

Rail Industry Worker

Software Familiarity

MS Project
Bluebeam
Revit

References

Cale Frederiks
Project Manager
Coolstore Road LXR
Verified on
October 21, 2024
Damien Bergstrum
Project Leader
Coolstore Road LXR
Verified on
July 1, 2024

Day Rate

$
1540
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

7
years

Recent Activity

  • Booked at Coolstore Road LXR for 4 months beginning in April as a Project Engineer
  • Positive feedback received from SEPA

About

Marty is a highly experienced PE, who adopted various roles throughout his most recent secondment with Negri Contractors. Initially engaged as a PE, the Client appreciated Marty’s construction acumen, professionalism & work-ethic, thus leading to his appointment as SPE for the back-half of his tenure.

• Integrated Management Systems (ISO 9001) Lead Auditor – JAS-ANZ
• An in-depth knowledge of Microsoft Office, specializing in both MS Excel and MS Project
• Strong leadership, communication and motivational skills Certified ‘Construction Induction’, in accordance with ‘WorkSafe’ Victoria standards
• Thorough understanding of VicRoads and Australian Standards
• Excellent time management and organizational skills
• Financial Budgeting, Forecasting and Scheduling
• Developing and Implementing Quality Assurance and Quantity Management Techniques / Systems

Skills

Bulk excavation
FRP works
Earthworks
Piling
In ground services
Pavements / shared user path
Retaining walls / systems
Tactiles and linemarking
Signage
Fencing
Temporary works
Hard landscaping
Soft landscaping
Cost Estimating & Tendering
Civil Engineering
Staging & Methodology

Marty

's Project Experience

Negri Contractors | July 2023 to Current
Project Engineer / Senior Project Engineer

Project(s): Burwood Highway & McMahons Road Intersection Upgrade

Key Duties:

  • Leadership role with three direct reports at Project Engineer level and several Site Engineers below
  • Managing self-performed earthworks, pavement construction, drainage, asphalt, as well as the coordination of multiple traffic switches
  • Responsible for preparing, updating and reporting a 4-week lookahead program directly to the client (MRPV), as well as feeding program updates into the Primavera P6 contract program
  • Responsible for preparing cost to complete forecasts, as well as reviewing and reporting on the Project Engineer’s forecasts
  • Inherited role as Quality Manager – corrected past performance and instilled confidence in the client
  • Responsible for overseeing all QA matters, setting targets and priorities for all engineers, resolving NCRs and defects and accurately reporting to the client
  • Responsible for administering contracts, including progress claim and variation assessment
  • Ensuring compliance with workplace safety and environmental objectives by planning, overseeing site works, and conducting regular audits

Laing O’Rourke | March 2023 to June 2023
Project Engineer

Project(s): South-Eastern Program Alliance (SEPA)

Key Duties:

  • Worked within the Structures team during a rail occupation, working specifically on shotcreting trench
    retaining walls
  • Responsible for managing a $12M Subcontractor package, including day-to-day and long-term planning
  • Responsible for administrating the Subcontract, including assessing Progress Claims and Variations
  • Ensured compliance with workplace safety and environmental objectives by planning, overseeing site works and conducting regular audits
  • Ensured compliance with quality objectives by conducting comprehensive reviews of structural drawings and regular inspections, to ensure as-constructed works align with design intent
  • Raised and closed RFIs and NCRs as required, to ensure any deviations from design are considered and achieve best-for-project outcomes
  • Demonstrated leadership skills by managing a large team of Subcontractors, supervisors and labourers in addition to site and graduate engineers

Seymour Whyte | March 2022 to March 2023
Project Engineer

Project(s): Port Rail Transformation Project (PRTP)

Key Duties:

  • Scope of works includes management of self-performed earthworks for track earthworks formation
  • Management of track, signalling and combined services route (CSR) subcontractors, including implementing safe-working arrangements for access into rail corridor
  • Develop and implement staging plans work methodologies and manage interfaces with rail authorities, tenants and adjacent projects (WGTP)
  • Compile and document all day works records and prepare variation claims for submission to client
  • Prepare vendor assessments and manage procurement process for assigned scope
  • Cost and productivity tracking and month end forecasting for numerous cost codes
  • Develop and maintain long term (8 week plus) construction program, as well as highly detailed rail occupation programs. Status and update program for client and senior leadership reporting purposes
  • Responsible for the successful delivery of a full suite of self-performed and subcontracted civil scopes, including bulk earthworks, drainage, pavements, lighting/ITS, asphalt, signage and road furniture, amongst others
  • Demonstrated ability to lead small teams of site and graduate engineers and provide ongoing training and mentorship
  • Responsible for quality assurance and lot closure. Ensured that all RFIs and NCRs are managed and closed expeditiously with consultation with designers, clients and stakeholders as required
  • Drove a strong HSEQ culture within the team and amongst site supervisory staff including meeting project specific KPIs

McConnell Dowell | April 2020 to March 2022
Project Engineer

Project(s): Healesville-Koo Wee Rup (North) Upgrade & Mordialloc Freeway Project

Key Duties:

  • Responsible for the successful delivery of a full suite of self-performed and subcontracted civil scopes, including bulk earthworks, drainage, pavements, lighting/ITS, asphalt, signage and road furniture, amongst others
  • Responsible for procurement of subcontractors and suppliers for various subcontract packages and driving negotiations and evaluations to obtain best value for money outcomes for the organization
  • Demonstrated capability in tender evaluations, estimates, cost tracking and cost forecasting for numerous scopes of works
  • Prepared and maintained short- and long-term lookahead programs to manage timeliness of delivery activities and explore options to accelerate programs and identify risks
  • Demonstrated ability to lead small teams of site and graduate engineers and provide ongoing training and mentorship
  • Responsible for quality assurance and lot closure. Ensured that all RFIs and NCRs are managed and closed expeditiously with consultation with designers, clients and stakeholders as required
  • Drove a strong HSEQ culture within the team and amongst site supervisory staff
  • Prepared numerous high quality construction execution procedures and risk assessments

WBHO Infrastructure | May 2018 to March 2020
Quality Lead / Nominated Authority

Project(s): Western Roads Upgrade (WRU)

Key Duties:

  • Responsible for completion and handover for Forsyth Rd Interchange in Hoppers Crossing
  • Established the quality and defect management systems and provided ongoing training for project teams
  • Negotiations with clients and key stakeholders for closure of NCRs, RFIs, design exceptions to achieve best for project outcomes
  • Responsible for establishing and managing completion program
  • Highly field based and technical role in ensuring bulk earthworks, pavements, drainage and structures were being constructed in accordance with VicRoads specifications, drawings and the project scope and delivery requirements
  • Responsible for design review, review of management plans and other critical construction documents
  • Built and maintained strong relationships with key stakeholders such as independent reviewers, clients, returned asset owners and subcontractors
  • Comprehensive and regular reporting to monitor performance and for early identification and resolution of project risks
  • Drove a best practice quality culture through education and training of applicable specifications and management plans
  • Managed the expeditious closure of RFIs and NCRs to ensure best quality outcomes are achieved for the project

VicRoads | February 2017 to April 2018
Project Engineer

Project(s): Warrandyte Bridge Upgrade

Key Duties:

  • Reviewed design packages to resolve project scope, delivery and constructibility issues and communicated outcomes with key stakeholders to achieve best for project outcomes
  • Financial management including forecasting, progress claim assessment, variation and claim assessment to ensure that VicRoads achieved best value-for-money outcomes
  • Reviewed contract documents such as environmental, safety and quality management plans and conducted regular surveillance to ensure contractor adheres to the plans
  • Conducted weekly OHS, environmental and quality audits by assessing the site against the contract plans, drawings and specifications to ensure VicRoads and the contractor maintains best construction practices

Availability

Get in touch with us to get real-time availability for
Marty
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1540
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

7
years

Education

Melbourne University

Bachelor of (Civil Systems) Science & Master of (Civil) Engineering

Qualifications

Rail Industry Worker

Software Familiarity

MS Project
Bluebeam
Revit

References

Cale Frederiks
Project Manager
Coolstore Road LXR
Verified on
October 21, 2024
Damien Bergstrum
Project Leader
Coolstore Road LXR
Verified on
July 1, 2024

Day Rate

$
1540
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

7
years

Recent Activity

  • Booked at Coolstore Road LXR for 4 months beginning in April as a Project Engineer
  • Positive feedback received from SEPA

About

Marty is a highly experienced PE, who adopted various roles throughout his most recent secondment with Negri Contractors. Initially engaged as a PE, the Client appreciated Marty’s construction acumen, professionalism & work-ethic, thus leading to his appointment as SPE for the back-half of his tenure.

• Integrated Management Systems (ISO 9001) Lead Auditor – JAS-ANZ
• An in-depth knowledge of Microsoft Office, specializing in both MS Excel and MS Project
• Strong leadership, communication and motivational skills Certified ‘Construction Induction’, in accordance with ‘WorkSafe’ Victoria standards
• Thorough understanding of VicRoads and Australian Standards
• Excellent time management and organizational skills
• Financial Budgeting, Forecasting and Scheduling
• Developing and Implementing Quality Assurance and Quantity Management Techniques / Systems

Skills

Bulk excavation
FRP works
Earthworks
Piling
In ground services
Pavements / shared user path
Retaining walls / systems
Tactiles and linemarking
Signage
Fencing
Temporary works
Hard landscaping
Soft landscaping
Cost Estimating & Tendering
Civil Engineering
Staging & Methodology

Marty

's Project Experience

Negri Contractors | July 2023 to Current
Project Engineer / Senior Project Engineer

Project(s): Burwood Highway & McMahons Road Intersection Upgrade

Key Duties:

  • Leadership role with three direct reports at Project Engineer level and several Site Engineers below
  • Managing self-performed earthworks, pavement construction, drainage, asphalt, as well as the coordination of multiple traffic switches
  • Responsible for preparing, updating and reporting a 4-week lookahead program directly to the client (MRPV), as well as feeding program updates into the Primavera P6 contract program
  • Responsible for preparing cost to complete forecasts, as well as reviewing and reporting on the Project Engineer’s forecasts
  • Inherited role as Quality Manager – corrected past performance and instilled confidence in the client
  • Responsible for overseeing all QA matters, setting targets and priorities for all engineers, resolving NCRs and defects and accurately reporting to the client
  • Responsible for administering contracts, including progress claim and variation assessment
  • Ensuring compliance with workplace safety and environmental objectives by planning, overseeing site works, and conducting regular audits

Laing O’Rourke | March 2023 to June 2023
Project Engineer

Project(s): South-Eastern Program Alliance (SEPA)

Key Duties:

  • Worked within the Structures team during a rail occupation, working specifically on shotcreting trench
    retaining walls
  • Responsible for managing a $12M Subcontractor package, including day-to-day and long-term planning
  • Responsible for administrating the Subcontract, including assessing Progress Claims and Variations
  • Ensured compliance with workplace safety and environmental objectives by planning, overseeing site works and conducting regular audits
  • Ensured compliance with quality objectives by conducting comprehensive reviews of structural drawings and regular inspections, to ensure as-constructed works align with design intent
  • Raised and closed RFIs and NCRs as required, to ensure any deviations from design are considered and achieve best-for-project outcomes
  • Demonstrated leadership skills by managing a large team of Subcontractors, supervisors and labourers in addition to site and graduate engineers

Seymour Whyte | March 2022 to March 2023
Project Engineer

Project(s): Port Rail Transformation Project (PRTP)

Key Duties:

  • Scope of works includes management of self-performed earthworks for track earthworks formation
  • Management of track, signalling and combined services route (CSR) subcontractors, including implementing safe-working arrangements for access into rail corridor
  • Develop and implement staging plans work methodologies and manage interfaces with rail authorities, tenants and adjacent projects (WGTP)
  • Compile and document all day works records and prepare variation claims for submission to client
  • Prepare vendor assessments and manage procurement process for assigned scope
  • Cost and productivity tracking and month end forecasting for numerous cost codes
  • Develop and maintain long term (8 week plus) construction program, as well as highly detailed rail occupation programs. Status and update program for client and senior leadership reporting purposes
  • Responsible for the successful delivery of a full suite of self-performed and subcontracted civil scopes, including bulk earthworks, drainage, pavements, lighting/ITS, asphalt, signage and road furniture, amongst others
  • Demonstrated ability to lead small teams of site and graduate engineers and provide ongoing training and mentorship
  • Responsible for quality assurance and lot closure. Ensured that all RFIs and NCRs are managed and closed expeditiously with consultation with designers, clients and stakeholders as required
  • Drove a strong HSEQ culture within the team and amongst site supervisory staff including meeting project specific KPIs

McConnell Dowell | April 2020 to March 2022
Project Engineer

Project(s): Healesville-Koo Wee Rup (North) Upgrade & Mordialloc Freeway Project

Key Duties:

  • Responsible for the successful delivery of a full suite of self-performed and subcontracted civil scopes, including bulk earthworks, drainage, pavements, lighting/ITS, asphalt, signage and road furniture, amongst others
  • Responsible for procurement of subcontractors and suppliers for various subcontract packages and driving negotiations and evaluations to obtain best value for money outcomes for the organization
  • Demonstrated capability in tender evaluations, estimates, cost tracking and cost forecasting for numerous scopes of works
  • Prepared and maintained short- and long-term lookahead programs to manage timeliness of delivery activities and explore options to accelerate programs and identify risks
  • Demonstrated ability to lead small teams of site and graduate engineers and provide ongoing training and mentorship
  • Responsible for quality assurance and lot closure. Ensured that all RFIs and NCRs are managed and closed expeditiously with consultation with designers, clients and stakeholders as required
  • Drove a strong HSEQ culture within the team and amongst site supervisory staff
  • Prepared numerous high quality construction execution procedures and risk assessments

WBHO Infrastructure | May 2018 to March 2020
Quality Lead / Nominated Authority

Project(s): Western Roads Upgrade (WRU)

Key Duties:

  • Responsible for completion and handover for Forsyth Rd Interchange in Hoppers Crossing
  • Established the quality and defect management systems and provided ongoing training for project teams
  • Negotiations with clients and key stakeholders for closure of NCRs, RFIs, design exceptions to achieve best for project outcomes
  • Responsible for establishing and managing completion program
  • Highly field based and technical role in ensuring bulk earthworks, pavements, drainage and structures were being constructed in accordance with VicRoads specifications, drawings and the project scope and delivery requirements
  • Responsible for design review, review of management plans and other critical construction documents
  • Built and maintained strong relationships with key stakeholders such as independent reviewers, clients, returned asset owners and subcontractors
  • Comprehensive and regular reporting to monitor performance and for early identification and resolution of project risks
  • Drove a best practice quality culture through education and training of applicable specifications and management plans
  • Managed the expeditious closure of RFIs and NCRs to ensure best quality outcomes are achieved for the project

VicRoads | February 2017 to April 2018
Project Engineer

Project(s): Warrandyte Bridge Upgrade

Key Duties:

  • Reviewed design packages to resolve project scope, delivery and constructibility issues and communicated outcomes with key stakeholders to achieve best for project outcomes
  • Financial management including forecasting, progress claim assessment, variation and claim assessment to ensure that VicRoads achieved best value-for-money outcomes
  • Reviewed contract documents such as environmental, safety and quality management plans and conducted regular surveillance to ensure contractor adheres to the plans
  • Conducted weekly OHS, environmental and quality audits by assessing the site against the contract plans, drawings and specifications to ensure VicRoads and the contractor maintains best construction practices