Royal Melbourne Institute of Technology (RMIT)
University: Bachelor of (Mechanical) Engineering (Honours) with aBachelor of Business Management
• Strong leadership, communication and motivational skills – with an ability to deliver complex information to a diverse group of stakeholders.
• Management of financial budgeting, forecasting and scheduling.
• Tender analysis, price negotiation and procurement selection.
• Proven ability to self-start, multitask, prioritize tasks and time manage.
• An in-depth knowledge of both VicRoads, ARTC and V/Line Specifications.
• Undertaking contract reviews, with an understanding of required contractual departures.
• Succinctly delivering complex information to a diverse group of stakeholders.
• Proficient in the use of the MS Office package, Bluebeam Revu, TeamBinder, QAntrol and SnagMaster.
Decmil Southern Pty Ltd (as part of the Vicconnect Alliance) | September 2022 to February 2024
Project Engineer
Gippsland Line Upgrade (GLU)
Key Duties:
A. Provided Engineering support within the Alliance, working closely with an array of project teams (Design, Commercial and Civil / Rail Systems Delivery).
B. Assisted in reviewing the monthly forecast cost position and identifying areas of potential optimisation.
C. Identified, quantified and substantiated all Claims (Adjustment Events) sought after by the Alliance – in an effort to recover significant Project outlay costs.
D. Reviewed and analyzed the Alliance’s contract with the Project Owner, so as to establish grounds for cost reimbursement, as well as identifying Clauses which have the potential to lead to additional Claims.
E. Reviewed the Scope of Works in tandem with the V/Line Specifications, to establish areas of entitlement.
F. Liaised with both on-site personnel and planners to identify project delays and slippage from program, so as to consequently draft and submit delay Claims to the Project Owner.
G. Drafted prospective, contemporaneous and retrospective costing schedules for all identified Claims.
H. Presented workings and identified Claims to Senior Management, Project Directors and Project Owners.
Seymour Whyte Constructions | May 2022 to September 2022
Project Engineer
Keep Ballarat Moving (KBM)
Key Duties:
A. Tracked, forecasted and reported project costs to Senior Management
B. Formulated and monitored dynamic construction programs, in order to ensure deadlines were met
C. Liaised with the Project design team to model any design changes required, based on identified on-site constraints
D. Worked closely with the Client / Client representatives and ensured any Non-Conformances were captured and rectified within a timely manner
E. Project Procurement and maintaining supplier relationships throughout the duration of the Project, whilst simultaneously coordinating works - based on Sub-Contractor availability
F. Negotiated material suppliers and trade subcontractors, in an effort to maintain budget
G.Mentored Graduate and Site Engineers in all aspects of construction, quality and project requirements
Seymour Whyte Constructions | March 2022 to May 2022
Site Engineer
Port Rail Transformation Project (PRTP)
Key Duties:
A. Assisted in the management of earthworks, including but not limited to Demolition works, Lime Stabilization, underside of pavement and track slab material placement and filling works up against a structure (Retaining Wall).
B. Ensured works performed on-site are carried out in accordance with IFC drawings, Inspection Test Plans and VicRoads / ARTC Specifications.
C. Ensured all works undertaken on-site have a corresponding quality lot opened via the SWIFT application and all required records and test reports have been obtained and reviewed - prior to close-out.
D. Liaised with Seymour Whyte’s client (The Port of Melbourne) daily, to inform of them of works undertaken on-site and obtain approval for all Hold Points - prior to works proceeding.
E. Financial management including forecasting, progress claims and daily cost tracking, to ensure project outlays do not exceed forecast.
WBHO Infrastructure Pty Ltd | August 2020 to February 2022
Site Engineer
Western Roads Upgrade – Projects 02 & 03
Key Duties:
A. Liaised with Subcontractors performing all re-works and negotiated their prices to ensure all budget constraints had been adhered to.
B. Ensured all works performed on-site had been constructed as per design and all parties involved adhered to the required Inspection Test Plan (particularly, in relation to Hold Points).
C. Liaised with Councils and other government bodies to ensure works performed on public roads had a specific Memorandum of Authorization, which had been signed off for the estimated duration of works.
D. Assisted the Quality team in closing out all open lots via the QAntrol portal and responded to any technical queries the Independent Reviewer had in relation to conformity.
E. Ensured defects on-site had been logged, rectified, and closed out (with the approval of the Nominated Authority), via the Snag Master Software application.
Arcon Civil Pty Ltd | August 2020 to Present
Civil & Infrastructure Engineer
Key Duties:
A. Reviewing IFT (Issued-For-Tender) / IFC (Issued-For-Construction) drawings and performing detailed quantity Take-offs, in order to develop Schedules of Quantities and coordinate project particulars.
B. Preparing Request for Tender Documentation, whilst subsequently ensuring an accurate Scope of Works has been developed and issued to relevant Material Suppliers and Subcontractors.
C. Coordinating with Subcontractors to ensure that key contractual matters are addressed and adhered to, prior to the commencement of works.
D. Performing project planning and programming tasks.
E. Maintaining Production Reports for Daily and Monthly costing, in an effort to effectively track project expenses.
Civilink Pty Ltd | March 2020 to July 2020
Site Engineer
Western Roads Upgrade – Project 08
Key Duties:
A. Assisted in the development of a Construction Management Plan entailing a Site Environmental Management Plan (SEMP), Inspection Test Plans (ITPs), Safe Works Method Statements (SWMS) and Traffic Management Plans (TMPs).
B. Ensured Quality Control standards were being adhered to, through inspecting works both In-Progress and Post-Completion.
C. Assisted in the implementation of Safe Work Method Statements (SWMS) and Inspection Test Plans (ITPs) on-site.
D. Completed both Daily and Weekly Progress Tracking Reports, to ensure project milestones were being achieved.
Quantas Group | November 2017 to February 2020
Aerospace / Aircraft Engineer
Royal Melbourne Institute of Technology (RMIT)
University: Bachelor of (Mechanical) Engineering (Honours) with aBachelor of Business Management
• Strong leadership, communication and motivational skills – with an ability to deliver complex information to a diverse group of stakeholders.
• Management of financial budgeting, forecasting and scheduling.
• Tender analysis, price negotiation and procurement selection.
• Proven ability to self-start, multitask, prioritize tasks and time manage.
• An in-depth knowledge of both VicRoads, ARTC and V/Line Specifications.
• Undertaking contract reviews, with an understanding of required contractual departures.
• Succinctly delivering complex information to a diverse group of stakeholders.
• Proficient in the use of the MS Office package, Bluebeam Revu, TeamBinder, QAntrol and SnagMaster.
Decmil Southern Pty Ltd (as part of the Vicconnect Alliance) | September 2022 to February 2024
Project Engineer
Gippsland Line Upgrade (GLU)
Key Duties:
A. Provided Engineering support within the Alliance, working closely with an array of project teams (Design, Commercial and Civil / Rail Systems Delivery).
B. Assisted in reviewing the monthly forecast cost position and identifying areas of potential optimisation.
C. Identified, quantified and substantiated all Claims (Adjustment Events) sought after by the Alliance – in an effort to recover significant Project outlay costs.
D. Reviewed and analyzed the Alliance’s contract with the Project Owner, so as to establish grounds for cost reimbursement, as well as identifying Clauses which have the potential to lead to additional Claims.
E. Reviewed the Scope of Works in tandem with the V/Line Specifications, to establish areas of entitlement.
F. Liaised with both on-site personnel and planners to identify project delays and slippage from program, so as to consequently draft and submit delay Claims to the Project Owner.
G. Drafted prospective, contemporaneous and retrospective costing schedules for all identified Claims.
H. Presented workings and identified Claims to Senior Management, Project Directors and Project Owners.
Seymour Whyte Constructions | May 2022 to September 2022
Project Engineer
Keep Ballarat Moving (KBM)
Key Duties:
A. Tracked, forecasted and reported project costs to Senior Management
B. Formulated and monitored dynamic construction programs, in order to ensure deadlines were met
C. Liaised with the Project design team to model any design changes required, based on identified on-site constraints
D. Worked closely with the Client / Client representatives and ensured any Non-Conformances were captured and rectified within a timely manner
E. Project Procurement and maintaining supplier relationships throughout the duration of the Project, whilst simultaneously coordinating works - based on Sub-Contractor availability
F. Negotiated material suppliers and trade subcontractors, in an effort to maintain budget
G.Mentored Graduate and Site Engineers in all aspects of construction, quality and project requirements
Seymour Whyte Constructions | March 2022 to May 2022
Site Engineer
Port Rail Transformation Project (PRTP)
Key Duties:
A. Assisted in the management of earthworks, including but not limited to Demolition works, Lime Stabilization, underside of pavement and track slab material placement and filling works up against a structure (Retaining Wall).
B. Ensured works performed on-site are carried out in accordance with IFC drawings, Inspection Test Plans and VicRoads / ARTC Specifications.
C. Ensured all works undertaken on-site have a corresponding quality lot opened via the SWIFT application and all required records and test reports have been obtained and reviewed - prior to close-out.
D. Liaised with Seymour Whyte’s client (The Port of Melbourne) daily, to inform of them of works undertaken on-site and obtain approval for all Hold Points - prior to works proceeding.
E. Financial management including forecasting, progress claims and daily cost tracking, to ensure project outlays do not exceed forecast.
WBHO Infrastructure Pty Ltd | August 2020 to February 2022
Site Engineer
Western Roads Upgrade – Projects 02 & 03
Key Duties:
A. Liaised with Subcontractors performing all re-works and negotiated their prices to ensure all budget constraints had been adhered to.
B. Ensured all works performed on-site had been constructed as per design and all parties involved adhered to the required Inspection Test Plan (particularly, in relation to Hold Points).
C. Liaised with Councils and other government bodies to ensure works performed on public roads had a specific Memorandum of Authorization, which had been signed off for the estimated duration of works.
D. Assisted the Quality team in closing out all open lots via the QAntrol portal and responded to any technical queries the Independent Reviewer had in relation to conformity.
E. Ensured defects on-site had been logged, rectified, and closed out (with the approval of the Nominated Authority), via the Snag Master Software application.
Arcon Civil Pty Ltd | August 2020 to Present
Civil & Infrastructure Engineer
Key Duties:
A. Reviewing IFT (Issued-For-Tender) / IFC (Issued-For-Construction) drawings and performing detailed quantity Take-offs, in order to develop Schedules of Quantities and coordinate project particulars.
B. Preparing Request for Tender Documentation, whilst subsequently ensuring an accurate Scope of Works has been developed and issued to relevant Material Suppliers and Subcontractors.
C. Coordinating with Subcontractors to ensure that key contractual matters are addressed and adhered to, prior to the commencement of works.
D. Performing project planning and programming tasks.
E. Maintaining Production Reports for Daily and Monthly costing, in an effort to effectively track project expenses.
Civilink Pty Ltd | March 2020 to July 2020
Site Engineer
Western Roads Upgrade – Project 08
Key Duties:
A. Assisted in the development of a Construction Management Plan entailing a Site Environmental Management Plan (SEMP), Inspection Test Plans (ITPs), Safe Works Method Statements (SWMS) and Traffic Management Plans (TMPs).
B. Ensured Quality Control standards were being adhered to, through inspecting works both In-Progress and Post-Completion.
C. Assisted in the implementation of Safe Work Method Statements (SWMS) and Inspection Test Plans (ITPs) on-site.
D. Completed both Daily and Weekly Progress Tracking Reports, to ensure project milestones were being achieved.
Quantas Group | November 2017 to February 2020
Aerospace / Aircraft Engineer