Log out
AA
First
Last
Back

Ruairí Green

Project Engineer
Request to Book

Availability

Get in touch with us to get real-time availability for
Ruairí
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1250
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

6
years

Education

BE Civil Engineering (2:1)
National University of Ireland
(2015-2019)

Leaving Certificate 2015
St.Pauls Secondary School
2009- 2015
535 CAO Points

Qualifications

BEng

Software Familiarity

AutoCAD
Revit

References

No items found.

Day Rate

$
1250
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

6
years

Recent Activity

About

Excellent technical and interpersonal skills with proven track record in fostering positive relationships with clients, subcontractors, senior management, and key stakeholders with the Civil Sector in Ireland and Australia.

Skills

Building Construction
Civil Engineering
Bulk excavation
Earthworks
FRP works
In ground services
MEP services
Waste water
Traffic Management

Ruairí

's Project Experience

Quickway Constructions | Project Engineer
Henry Lawson Drive Upgrade Stage 1 | August 2023 - August 2024

  • Completing relocation of all services. Replaced over 600m of water main (375/450/500DICL) and also had to install temporary 100-560 OD poly lines. This ensured the programme would progress on other works and ensured staging of the shutdowns would be successful due to network constraints.
  • Works were dictated by difficult staging restraints and included 3 bores under a major road with multiple services in close proximity and deep excavations.
  • Successfully completed over 7 difficult shutdowns throughout the project.
  • Cost tracking, forecasting, planning, and liaising with other divisions were part of the weekly workloads.

Quickway Constructions | Project Engineer
Coffs Harbour Bypass- Northern Utilities Relocation | October 2022 - August 2023

  • Completing design and construction of over 7km of water mains of various size and materials, including HDDs, case bores and micro tunnels
  • Works included HDDs, a dual 500 DICL encasement over 130m long, a micro tunnel, case bores and overcoming difficult local terrain including hills of 30% and unsuitable ground.
  • Gained valuable experience in commercial and program management.

Clonmel Enterprises, Dublin, Ireland | Site Engineer
Balbutcher Junction Realignment/Sandyford Cycle Route/Little Sisters Carpark/Active School Travel | May 2020 - March 2022

  • Major and minor infrastructure projects across Dublin City with projects ranging from €1-10M.
  • Worked in archaeological and environmentally sensitive areas.
  • Dealt with challenging street works, services, and major junctions.
  • Developed new business practicesfor the teaching manual.
  • Improved and updated all company policies and guidelines.

J.J. Rhatigan & Co| Co, Galway | Site Engineer
Phase 2 of Gateway Retail Park Knocknacarra | September - April 2020

  • Involved in the construction of a 2 story 15,000m2 mixed use development, a 440m2 extension to the existing Dunnes Stores Building, and construction of an underground car park.
  • Works included all associated services required and were carried out in the middle of a busy area that included a school, a shopping centre and housing estates.

MOS Construction | Project Manager
San Francisco. CA (USA) | May-August 2019

Project included the installation of all ground services(gas, electricity, storm water, cable, water and sewer) to 9 dwellings.
Gained experience of how to run a job with many shareholders and under time and financial pressure.

J Coffey Construction Ltd, Athenry Co. Galway | Student Engineer
Breaffy Sewerage Scheme | April-August 2018

  • Involved in a design and build of a sewerage pumping station that included: Raw sewage pumping station for a PE of 2550, holding tanks, all MEICA installations, interconnecting pipework, 300m of foulsewers draining to the pumping station and 200m of a rising main.
  • Acted as a site engineer responsible for setting out, compiling as-build drawings, document control and ensured HSQE policies were implemented.

Availability

Get in touch with us to get real-time availability for
Ruairí
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1250
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

6
years

Education

BE Civil Engineering (2:1)
National University of Ireland
(2015-2019)

Leaving Certificate 2015
St.Pauls Secondary School
2009- 2015
535 CAO Points

Qualifications

BEng

Software Familiarity

AutoCAD
Revit

References

No items found.

Day Rate

$
1250
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

6
years

Recent Activity

About

Excellent technical and interpersonal skills with proven track record in fostering positive relationships with clients, subcontractors, senior management, and key stakeholders with the Civil Sector in Ireland and Australia.

Skills

Building Construction
Civil Engineering
Bulk excavation
Earthworks
FRP works
In ground services
MEP services
Waste water
Traffic Management

Ruairí

's Project Experience

Quickway Constructions | Project Engineer
Henry Lawson Drive Upgrade Stage 1 | August 2023 - August 2024

  • Completing relocation of all services. Replaced over 600m of water main (375/450/500DICL) and also had to install temporary 100-560 OD poly lines. This ensured the programme would progress on other works and ensured staging of the shutdowns would be successful due to network constraints.
  • Works were dictated by difficult staging restraints and included 3 bores under a major road with multiple services in close proximity and deep excavations.
  • Successfully completed over 7 difficult shutdowns throughout the project.
  • Cost tracking, forecasting, planning, and liaising with other divisions were part of the weekly workloads.

Quickway Constructions | Project Engineer
Coffs Harbour Bypass- Northern Utilities Relocation | October 2022 - August 2023

  • Completing design and construction of over 7km of water mains of various size and materials, including HDDs, case bores and micro tunnels
  • Works included HDDs, a dual 500 DICL encasement over 130m long, a micro tunnel, case bores and overcoming difficult local terrain including hills of 30% and unsuitable ground.
  • Gained valuable experience in commercial and program management.

Clonmel Enterprises, Dublin, Ireland | Site Engineer
Balbutcher Junction Realignment/Sandyford Cycle Route/Little Sisters Carpark/Active School Travel | May 2020 - March 2022

  • Major and minor infrastructure projects across Dublin City with projects ranging from €1-10M.
  • Worked in archaeological and environmentally sensitive areas.
  • Dealt with challenging street works, services, and major junctions.
  • Developed new business practicesfor the teaching manual.
  • Improved and updated all company policies and guidelines.

J.J. Rhatigan & Co| Co, Galway | Site Engineer
Phase 2 of Gateway Retail Park Knocknacarra | September - April 2020

  • Involved in the construction of a 2 story 15,000m2 mixed use development, a 440m2 extension to the existing Dunnes Stores Building, and construction of an underground car park.
  • Works included all associated services required and were carried out in the middle of a busy area that included a school, a shopping centre and housing estates.

MOS Construction | Project Manager
San Francisco. CA (USA) | May-August 2019

Project included the installation of all ground services(gas, electricity, storm water, cable, water and sewer) to 9 dwellings.
Gained experience of how to run a job with many shareholders and under time and financial pressure.

J Coffey Construction Ltd, Athenry Co. Galway | Student Engineer
Breaffy Sewerage Scheme | April-August 2018

  • Involved in a design and build of a sewerage pumping station that included: Raw sewage pumping station for a PE of 2550, holding tanks, all MEICA installations, interconnecting pipework, 300m of foulsewers draining to the pumping station and 200m of a rising main.
  • Acted as a site engineer responsible for setting out, compiling as-build drawings, document control and ensured HSQE policies were implemented.