Availability

Get in touch with us to get real-time availability for
Sat
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1400
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

10
years

Education

• Bachelor of Engineering in Civil Engineering (2006), Mumbai University, India
• Post-Graduation in Construction Management (2008), NICMAR, Mumbai India.
• Executive master’s in business administration in Operation Management, IMSRC (2009)
• Certified Course in Asta Power Project from Basic, Intermediate and Advance Level- London.
• Certified as Professional Civil Engineer, Skill Level-1 by Engineer Australia.
• Certificate course in (Microsoft Project Planner), India.
• Civil Engineer Accreditation by Dubai Municipality for Unlimited floors.
• Certified Course in Claim Preparation & Claim Management, HLG Training Program.

Qualifications

Get in touch with us for further details.

Software Familiarity

P6 (Primavera)

References

No items found.

Day Rate

$
1400
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

10
years

Recent Activity

About

Key Area of Experience

  • 17 years working in the Construction Industry of Australia, United Kingdom, UAE, Oman & India.
  • P6, Synchro 4D integration with Asta & Primavera Programme on live project. Worked on Roads, Tunnel, Bridges, Bridge over rail, Infrastructure, civil, Airports, Oil & Gas, Windfarm, Residential, Hotel, Office projects.
  • Worked on Delay analysis, Extension of Time & forensic claim analysis.
  • High Value, Complex infrastructure, multistory project experience. Tender, Pre-construction & Live Site experience.
  • Proficient in planning Software Primavera P6, Microsoft Project, Turbo chart, Asta Power Projects, Synchro(4D) & Excel.
  • Lead/Individual planner on Large & multi-Projects. Achieved production output research study in London & Dubai. Lead Multi-National Contractor Planning Protocol & Procedure Experience.

Skills

Civil Engineering
Staging & Methodology

SKB has vast experience providing expert services in Planning and Program Management. We provide confidence to our clients enabling timely decision making and risk mitigation throughout the full lifecycle of project delivery.

Sat

's Project Experience

Senior Planner | Jan-2024 - current
UGL- CIMIC Group | West gate Tunnel Project

Project is consisting of 2 TBM Tunnel, OB-3.6km & IB-2.6km with Ventilation & substation on both end of the tunnel. Tunnel is divided in Mainline & Service Tunnel. 24 number of bridges connecting tunnel and existing freeway. UGL scope is installation & commissioning of Mechanical & Electrical scope for the project.

Working in UGL-John Holland & CPB JV venture. Co-ordinating civil, MEI Program. Creating Planning dashboard, weekly, monthly report, and Programme update. Zone wise Histogram, weekly critical path analysis, Programme revisions & mitigation strategy building. Creating as-built Programme. Assisting control and commercial department to create their claim & reports.

Senior Planner | Nov-2022 - Dec-2023
BMD | Mickleham Road Upgrade (MRPV)

Contract Value: $115 Million Location: Mickleham Road Victoria, Australia.

  • Various Zone of work with multiple traffic stages., Civil, Utility, retaining walls, Working as Lead Planner, prepared Contract programme, detailed cost loaded programme, Design, Procurement schedules, Weekly progress update, Client Management.

Project: Western Treatment Plant (Melbourne Water)

Contract Value: $280 Million Location: Werribee Melbourne Victoria, Australia.

Project Duration: 32 Months starting in Aug 2022.

  • 5 Number of 85m Dia. Concrete tank, with precast wall, Incl. Major Mechanical and Electrical packages. Feed, Effluent WAS Pipeline, Substation, Blower buildings.

Senior Planner | Mar-2021 to Nov-2022
DECMIL | Barwon Head Road Development (MRPV)
$89M

Project Duration: 28 Months
6 Zone of work with multiple traffic stages., Civil, Utility, Retaining walls and bridge Construction.

Working as Lead Planner, prepared Contract programme, Target programme, Design, Procurement schedules, Weekly progress update, KPI, Progress Dashboard, comments on project progress. Client Progress presentation.

Project: Structure Rehabilitation North & Southeast. (MRPV) – Road Maintenance
Contract Value: $30 Million Location: North & Southeast of Melbourne Victoria, Australia.
Project Duration: 9 Months starting in Apr 2022.

Barry Road work over Rail, 8 multiple sites on east & southeast location for Culvert replacement and Structure strengthening and cathodic protection. Pre-Tender programme, Tender Programme Basis of schedule, Resource and cost loaded Contract Programme. Weekly programme updates, Interface management, Design, Procurement and Authority update. Client Progress presentation.

Project: Rayan Corner Windfarm. – Renewables
Contract Value: $75 Million Location: Port Fairy Victoria, Australia.
Project Duration:14 Months. Worked on Tender, Contract & Target Programme. Prepared Manpower, Material & cost loaded on programme. Set-up Reporting system in In-eight Submitted various Extension of Time from Rev 1 to 10. 218MW, 52 Wind turbines. 33kv switch room and substation. 39km of access tracks.

Project: Crook well 3 windfarms. – Renewables
Contract Value: $21 Million Location: Crook well 3 New South Wales, Australia.
Project Duration: 13 Months. Worked on Tender, Contract & Target Programme. Prepared Manpower, Material & cost loaded on programme. Set-up Reporting system in In-eight. 50MW, 16 Wind turbines and 16km of access tracks.

Project: Plenty Road Upgrade Stage 2. – Infrastructure
Contract Value: $105 Million Location: Mill Park, Victoria Australia.
Project Duration: 22 Months. design and construction for Stage 2 of the Plenty Road Upgrade Project which targets the seven km. stretch of road between Bush Boulevard and Bridge Inn Road. Worked on Site team programme and Prepared Monthly reports. Decmil Tender Work: SM Workshop Extension for Rail in Western Australia, Tranche 2B, 3, 4 & 6 (MRPV).

Senior Planner | Sep-18 to Jan-2021

John SISK & Sons, UK South

Travelodge Hotel (Design & Build) (G+18 story Hotel)- Commercial
Contract Value: £ 40 Million Location: Canary Wharf, London, UK
Project Duration: 101 Weeks

  • Working as Lead Planner prepared Contract programme, Target programme, fully linked 4D programme with linking Programme & 3D Model, Create multiple programme option in 4D. Timescale video for project manager review. Clash detection and construction methodology check in Synchro software.

Premier Inn Hotel (Design & Build) (G+30 story Hotel + Residential) - Commercial
Contract Value: £61 Million Location: Canary Wharf West ferry, London, UK
Project Duration: 131 Weeks

  • Role: Lead Planner - Work on Tender to Contract Programme. On-site short-term Programme. Design, Procurement programme. 4D Project implementation with help of Synchro, Naviswork, Asta & Primavera. Detect sequence clashes checking subcontractor programme on 4D. Submitted Extension of time for covid19 scenario. Weekly programme update, Progress Dashboard, KPI & Production study. What-If analysis on programme, Subcontractor programme audit & co-ordination.

Tender Work: Worked on a multiple types of Tender such as Infrastructure, Data center, Vaccination center, Office building rehabilitation & residential building in UK South region. Tender work includes quantifying the drawings, finalize logistic strategy, sequence of works, programme preparation, Management presentation, Supply chain feedback, tender risk analysis, Float analysis, Project benchmarking, 4D planning checks, Post Tender Client Presentation.

Anthology Deptford Foundry Phase 2 (Project Management) (G+21 story Residential) - Residential
Contract Value: £ 110 Million Location: Deptford, London, UK
Project Duration: 2 1⁄2 Years (Visiting 2-3 days a Week)

  • Role: Lead Planner – Prepared Revised Target Programme, Dashboard, KPI, Commissioning Programme. Delay Impact analysis, Snagging programme, Landscaping & Utilities programme. Weekly programme update and discuss the critical path with site management.

Senior Consultant | Jul-Aug 2018

Faithful+Gould (CTBH-Atkins) Dubai

Lead planner and cost controller on;

  • Project: Hail full field development, FEED project for client SNC-Lavalin. Gas production facility development project. - Oil and Gas

Senior Planning Engineer | Sep-16 to Jun-18

KIER International

  • Project: Dubai Residential Project.Al Barsha, 2 numbers of 14 story residential & retail buildings.

Senior Planning Engineer | Sep-13 to Sep-16

Taylor Woodrow International-VINCI Construction

Project: Al Bateen Airport Road and utilities upgrade. - Infrastructure

Project: PDO Vila, Road and infrastructure.

Project: VVIP Terminal building with Apron & Surrounding road and infrastructure.

Project: Abu Dhbai Airport terminal 3 Expansion/Bus gate Terminal and infrastructure.

Prior: Habtoor Leighton Group | Planner / Project planner over the 5 year period.

  • Abu Dhabi Commercial bank Delay analysis and Claim Submission.
  • Mafraq Hospital Extension of Time submission, Delay analysis and Claim Submission.
  • Queshawira oil field Development - On Site planner and Claim expert
  • Project: Al Bustan Mixed Used Developments,

Availability

Get in touch with us to get real-time availability for
Sat
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1400
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

10
years

Education

• Bachelor of Engineering in Civil Engineering (2006), Mumbai University, India
• Post-Graduation in Construction Management (2008), NICMAR, Mumbai India.
• Executive master’s in business administration in Operation Management, IMSRC (2009)
• Certified Course in Asta Power Project from Basic, Intermediate and Advance Level- London.
• Certified as Professional Civil Engineer, Skill Level-1 by Engineer Australia.
• Certificate course in (Microsoft Project Planner), India.
• Civil Engineer Accreditation by Dubai Municipality for Unlimited floors.
• Certified Course in Claim Preparation & Claim Management, HLG Training Program.

Qualifications

Get in touch with us for further details.

Software Familiarity

P6 (Primavera)

References

No items found.

Day Rate

$
1400
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

10
years

Recent Activity

About

Key Area of Experience

  • 17 years working in the Construction Industry of Australia, United Kingdom, UAE, Oman & India.
  • P6, Synchro 4D integration with Asta & Primavera Programme on live project. Worked on Roads, Tunnel, Bridges, Bridge over rail, Infrastructure, civil, Airports, Oil & Gas, Windfarm, Residential, Hotel, Office projects.
  • Worked on Delay analysis, Extension of Time & forensic claim analysis.
  • High Value, Complex infrastructure, multistory project experience. Tender, Pre-construction & Live Site experience.
  • Proficient in planning Software Primavera P6, Microsoft Project, Turbo chart, Asta Power Projects, Synchro(4D) & Excel.
  • Lead/Individual planner on Large & multi-Projects. Achieved production output research study in London & Dubai. Lead Multi-National Contractor Planning Protocol & Procedure Experience.

Skills

Civil Engineering
Staging & Methodology

SKB has vast experience providing expert services in Planning and Program Management. We provide confidence to our clients enabling timely decision making and risk mitigation throughout the full lifecycle of project delivery.

Sat

's Project Experience

Senior Planner | Jan-2024 - current
UGL- CIMIC Group | West gate Tunnel Project

Project is consisting of 2 TBM Tunnel, OB-3.6km & IB-2.6km with Ventilation & substation on both end of the tunnel. Tunnel is divided in Mainline & Service Tunnel. 24 number of bridges connecting tunnel and existing freeway. UGL scope is installation & commissioning of Mechanical & Electrical scope for the project.

Working in UGL-John Holland & CPB JV venture. Co-ordinating civil, MEI Program. Creating Planning dashboard, weekly, monthly report, and Programme update. Zone wise Histogram, weekly critical path analysis, Programme revisions & mitigation strategy building. Creating as-built Programme. Assisting control and commercial department to create their claim & reports.

Senior Planner | Nov-2022 - Dec-2023
BMD | Mickleham Road Upgrade (MRPV)

Contract Value: $115 Million Location: Mickleham Road Victoria, Australia.

  • Various Zone of work with multiple traffic stages., Civil, Utility, retaining walls, Working as Lead Planner, prepared Contract programme, detailed cost loaded programme, Design, Procurement schedules, Weekly progress update, Client Management.

Project: Western Treatment Plant (Melbourne Water)

Contract Value: $280 Million Location: Werribee Melbourne Victoria, Australia.

Project Duration: 32 Months starting in Aug 2022.

  • 5 Number of 85m Dia. Concrete tank, with precast wall, Incl. Major Mechanical and Electrical packages. Feed, Effluent WAS Pipeline, Substation, Blower buildings.

Senior Planner | Mar-2021 to Nov-2022
DECMIL | Barwon Head Road Development (MRPV)
$89M

Project Duration: 28 Months
6 Zone of work with multiple traffic stages., Civil, Utility, Retaining walls and bridge Construction.

Working as Lead Planner, prepared Contract programme, Target programme, Design, Procurement schedules, Weekly progress update, KPI, Progress Dashboard, comments on project progress. Client Progress presentation.

Project: Structure Rehabilitation North & Southeast. (MRPV) – Road Maintenance
Contract Value: $30 Million Location: North & Southeast of Melbourne Victoria, Australia.
Project Duration: 9 Months starting in Apr 2022.

Barry Road work over Rail, 8 multiple sites on east & southeast location for Culvert replacement and Structure strengthening and cathodic protection. Pre-Tender programme, Tender Programme Basis of schedule, Resource and cost loaded Contract Programme. Weekly programme updates, Interface management, Design, Procurement and Authority update. Client Progress presentation.

Project: Rayan Corner Windfarm. – Renewables
Contract Value: $75 Million Location: Port Fairy Victoria, Australia.
Project Duration:14 Months. Worked on Tender, Contract & Target Programme. Prepared Manpower, Material & cost loaded on programme. Set-up Reporting system in In-eight Submitted various Extension of Time from Rev 1 to 10. 218MW, 52 Wind turbines. 33kv switch room and substation. 39km of access tracks.

Project: Crook well 3 windfarms. – Renewables
Contract Value: $21 Million Location: Crook well 3 New South Wales, Australia.
Project Duration: 13 Months. Worked on Tender, Contract & Target Programme. Prepared Manpower, Material & cost loaded on programme. Set-up Reporting system in In-eight. 50MW, 16 Wind turbines and 16km of access tracks.

Project: Plenty Road Upgrade Stage 2. – Infrastructure
Contract Value: $105 Million Location: Mill Park, Victoria Australia.
Project Duration: 22 Months. design and construction for Stage 2 of the Plenty Road Upgrade Project which targets the seven km. stretch of road between Bush Boulevard and Bridge Inn Road. Worked on Site team programme and Prepared Monthly reports. Decmil Tender Work: SM Workshop Extension for Rail in Western Australia, Tranche 2B, 3, 4 & 6 (MRPV).

Senior Planner | Sep-18 to Jan-2021

John SISK & Sons, UK South

Travelodge Hotel (Design & Build) (G+18 story Hotel)- Commercial
Contract Value: £ 40 Million Location: Canary Wharf, London, UK
Project Duration: 101 Weeks

  • Working as Lead Planner prepared Contract programme, Target programme, fully linked 4D programme with linking Programme & 3D Model, Create multiple programme option in 4D. Timescale video for project manager review. Clash detection and construction methodology check in Synchro software.

Premier Inn Hotel (Design & Build) (G+30 story Hotel + Residential) - Commercial
Contract Value: £61 Million Location: Canary Wharf West ferry, London, UK
Project Duration: 131 Weeks

  • Role: Lead Planner - Work on Tender to Contract Programme. On-site short-term Programme. Design, Procurement programme. 4D Project implementation with help of Synchro, Naviswork, Asta & Primavera. Detect sequence clashes checking subcontractor programme on 4D. Submitted Extension of time for covid19 scenario. Weekly programme update, Progress Dashboard, KPI & Production study. What-If analysis on programme, Subcontractor programme audit & co-ordination.

Tender Work: Worked on a multiple types of Tender such as Infrastructure, Data center, Vaccination center, Office building rehabilitation & residential building in UK South region. Tender work includes quantifying the drawings, finalize logistic strategy, sequence of works, programme preparation, Management presentation, Supply chain feedback, tender risk analysis, Float analysis, Project benchmarking, 4D planning checks, Post Tender Client Presentation.

Anthology Deptford Foundry Phase 2 (Project Management) (G+21 story Residential) - Residential
Contract Value: £ 110 Million Location: Deptford, London, UK
Project Duration: 2 1⁄2 Years (Visiting 2-3 days a Week)

  • Role: Lead Planner – Prepared Revised Target Programme, Dashboard, KPI, Commissioning Programme. Delay Impact analysis, Snagging programme, Landscaping & Utilities programme. Weekly programme update and discuss the critical path with site management.

Senior Consultant | Jul-Aug 2018

Faithful+Gould (CTBH-Atkins) Dubai

Lead planner and cost controller on;

  • Project: Hail full field development, FEED project for client SNC-Lavalin. Gas production facility development project. - Oil and Gas

Senior Planning Engineer | Sep-16 to Jun-18

KIER International

  • Project: Dubai Residential Project.Al Barsha, 2 numbers of 14 story residential & retail buildings.

Senior Planning Engineer | Sep-13 to Sep-16

Taylor Woodrow International-VINCI Construction

Project: Al Bateen Airport Road and utilities upgrade. - Infrastructure

Project: PDO Vila, Road and infrastructure.

Project: VVIP Terminal building with Apron & Surrounding road and infrastructure.

Project: Abu Dhbai Airport terminal 3 Expansion/Bus gate Terminal and infrastructure.

Prior: Habtoor Leighton Group | Planner / Project planner over the 5 year period.

  • Abu Dhabi Commercial bank Delay analysis and Claim Submission.
  • Mafraq Hospital Extension of Time submission, Delay analysis and Claim Submission.
  • Queshawira oil field Development - On Site planner and Claim expert
  • Project: Al Bustan Mixed Used Developments,