Availability

Get in touch with us to get real-time availability for
Sel
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1350
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

8
years

Education

Bachelor of Engineering (Civil and Infrastructure) (Honours) at RMIT University

Qualifications

Rail Industry Worker
BEng

Software Familiarity

MS Project

References

Cale Frederiks
Project Manager
Coolstore Road LXR
Verified on
November 29, 2024
Damien Bergstrum
Project Leader
Coolstore Road LXR
Verified on
November 29, 2024

Day Rate

$
1350
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

8
years

Recent Activity

  • Booked at Dublin Road LXR for 3 months beginning 14th August as a Project Engineer
  • Extended to Coolstore Road LXR until the end of January 25 as a Project Engineer

About

Selman is a professional Engineer offering over 6 years of experience in delivering level crossing removal works and local/major road projects across Victoria.

Adaptable team-member, able to collaboratively develop a rapport with colleagues and excellent written/verbal communication skills. Selman holds a delivery record for a diverse portfolio of multiple projects as well as estimating experience and exceptional interface management between construction works and stakeholders.

Skills

Civil Engineering
Engineering design
Bulk excavation
Earthworks
FRP works
Temporary works
Staging & Methodology
Cost Estimating & Tendering

Sel

's Project Experience

Project Engineer | Sept 2024 - Jan 2025

Contract: SEPA (Laing O'Rourke) Dublin & Coolstore LXR 

Engaged to support the deliver of the civil's & roads packages for both Dublin and Coolstore rd LXR projects.

Project Engineer | April 2024 - July 2024

Contract: SRL (Burwood) Delcon Civil (Contract) 

Project Description:

  • High Risk Water and Sewer
  • Scope includes permanent works associated with water and sewer. Works include the mechanical excavation of shafts, installation of sewer using micro tunnelling method, install new maintenance holes, bypass existing sewer and make connections
  • Permanent works are also associated with the decommissioning of sewer and water assets

Role and responsibilities:

  • Part of the delivery and estimating team
  • Project estimating works for various projects utilising Excel and Expert
  • Delivery of water/sewer relocation and decommissioning works
  • Resource Management
  • Planning and sequencing construction activities
  • Design interaction - raising RFIs regarding design discrepancies
  • Cost tracking, budget analysis works and monthly forecasting
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance

Project Engineer | April 2023 to March 2024

South Dynon Train Maintenance Facility | Laing O’Rourke (Contract)

Project Description:

  • Upgrades to the South Dynon Train Maintenance Facility are increasing maintenance capacity and ensuring as much of the fleet as possible is available to deliver services.
  • The project consists of upgrading maintenance roads, infrastructure, and amenities at the site.

Role and responsibilities:

  • Part of both the delivery and interface team
  • Resource Management throughout Project(s) duration
  • Managing Piling subcontractor
  • Managing CSR Subcontractor
  • Planning and sequencing construction activities
  • Design interaction - raising RFIs regarding design discrepancies
  • Cost tracking and budget analysis works
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance
  • Interface responsibilities included the interaction between the client and West Gate Tunnel
  • Project to coordinate interface scope of works on a daily basis

Site Engineer | November 2022 to April 2023

Pound Road West Upgrade | Seymour Whyte (Contract)

Project Description:

The Pound Road West upgrade is part of the broader $3.4 billion Suburban Roads Upgrade – South Eastern and Northern Roads project. The project is jointly funded by the Federal Government ($1.14 billion) and the State Government ($2.27 billion). Pound Road West upgrade project in Melbourne is set to improve access in and around the Dandenong South employment hub.

The project comprises of the following:
- 2km Pound Road West duplication (connection between Abbotts Road and South Gippsland Highway)
- Modification of two existing traffic signalised intersections and construction of two new signalised intersections
- Construction of new shared walking and cycling paths

Role and responsibilities:

  • Predominantly part of the delivery team for multiple road occupation works
  • Procurement and Resource Management throughout Project(s) duration
  • Managing subcontractors and client representatives
  • Planning and sequencing construction activities
  • Design interaction - raising RFIs regarding design discrepancies
  • Cost tracking and budget analysis works
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance

Site Engineer / April 2022 – November 2022

John Holland (Contract) 

Project Description:

North West Program Alliance (NWPA) – Preston Level Crossing Removal Project (Civil Team)

  • The Level Crossing Removal Program (LXRP) is one of the Victorian Government's key transport infrastructure projects. Part of an overarching policy to improve Melbourne's transport network, its stated aim is to remove 50 of the most dangerous and congested level crossings in Melbourne with an overall budget of $8.3 billion. The Preston level crossings at Murray Road, Cramer Street, Bell Street and Oakover Road, were
    removed by raising the Mernda rail line over the roads

North West Program Alliance (NWPA) – Preston Level Crossing Removal Project (Civil Team)

Project Description:

  • The Level Crossing Removal Program (LXRP) is one of the Victorian Government's key transport infrastructure projects. Part of an overarching policy to improve Melbourne's transport network, its stated aim is to remove 50 of the most dangerous and congested level crossings in Melbourne with an overall budget of $8.3 billion. The Preston level crossings at Murray Road, Cramer Street, Bell Street and Oakover Road, were removed by raising the Mernda rail line over the roads

Role and responsibilities:

  • Working within the civil team to deliver scopes including formations, retaining walls, roadworks and carparks
  • Construction and interface coordination with structural and landscaping teams
  • Procurement and Resource Management throughout Project(s) duration
  • ITP review and implementation, closing lots and punch lists
  • Raising RFIs regarding design discrepancies
  • Conducted weekly environmental, safety and traffic audits
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance

Site Engineer / January 2022 – April 2022

Hopper Crossing Level Crossing Removal | McConnell Dowell (Contract) 

Project Description:
Western Program Alliance (WPA) – Old Geelong Road, Hoppers Crossing Level Crossing Removal Project (Carpark construction, service installations at structure interface, major road intersection upgrade)

  • The $355.5 million package saw two dangerous level crossings removed in Melbourne’s west. This was followed by the creation of a road bridge near the Old Geelong Road level crossing in Hoppers Crossing and a rail bridge over the Werribee Street level crossing in Werribee

Role and responsibilities:

  • Managing civil and road works in the northern precinct area (OGR1) at the interface of the newly developed pedestrian bridge
  • Construction and coordination with structural teams
  • Planning, programming and developing construction execution strategies for multiple work packages
  • Managing a team consisting of supervisors and graduate engineers
  • Liaising with subcontractors, DOT and City West Water
  • Procurement and Resource Management throughout Project(s) duration
  • ITP review and implementation, closing lots and punch lists
  • Raising IRFIs regarding design discrepancies
  • Conducted weekly environmental, safety and traffic audits
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance

Project Engineer / January 2021 – January 2022

AMG Civil Group (Full time) 

Project Description:

  • Multiple Subdivision Projects with individual budgets up to $9M, totalling in excess of $15M per annum

Role and responsibilities:

  • Developing Construction Management Plan, and correlating HSEQ documentation
  • Implementing relevant governing authority specifications and/or standard drawings
  • Reviewing design drawings and performing all necessary take-offs
  • Procurement and Resource Management throughout Project(s) duration
  • Developing Project construction programmes via Gantter and MS Project
  • Conducting weekly safety audits
  • Monitoring and tracking daily construction tasks, including subsequent cost tracking
  • Reviewing and certifying monthly subcontractor claims
  • Liaising with design engineers and clients to ensure all Project requirements are met
  • Completing monthly progress claims for consulting engineers

Project Engineer / July 2020 – November 2020

Civilink (Full time) 

Project Description:

Western Roads Upgrade - Project 3: Derrimut Road Upgrade

  • Multiple subdivision projects: Managing individual Projects with budgets up to $5M, totalling in excess of $12M per annum

Role and responsibilities:

  • Reviewed design drawings and performed all necessary take-offs
  • Developed fortnightly MS Excel programmes, from baseline programme provided by management
  • Developed various construction methodologies and safety documentation
  • Prepared Risk and Occupational Health and Safety registers
  • Prepared Request for Tender documentation
  • Prepared Purchase Orders and Subcontract Agreements
  • Liaised with Resource Manager to on-board and deliver necessary equipment, machinery and plant
  • Coordinated and planned construction activities to ensure the most efficient use of resources
  • Conducted weekly environmental, safety and traffic audits
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance

Site Engineer / February 2018– July 2020

Winslow Constructors (Full time) 

Project Description:

  • Multiple Subdivision Projects with individual budgets up to $19M, totalling in excess of $25M per annum

Role and responsibilities:

  • Reported to various Project Managers, across numerous Projects around Melbourne
  • Reviewed design drawings and performed all necessary take-offs
  • Developed various construction methodologies and safety documentation
  • Conducted weekly environmental, safety and traffic audits
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance

Associate Technical Drafter / June 2016– August 2016

KBR (Full time)

Role and responsibilities:

  • Acted as a Draftsman on the CSR Slab for McKinnon Road Level Crossing Removal Project
  • Contributed to the bridge design at McKinnon, Ormond and Bentleigh Stations
  • Assisted engineers with certain requirements in reference to drafting needs
  • Developed drawings that comply to Australian Engineering Standards
  • Utilised various design programs, including AutoCAD & Micro Station

Work Experience / June 2011 – July 2011

Abi Group (LendLease)

Role and responsibilities:

  • Various site visits including bridge developments and Wyndham City Council drainage instalments in Truganina
  • Office work: answering phone enquiries, installing computer programs and data work involving on-site profiles
  • On-site work: observing pipeline drainage instalments, various construction sites, bridge hydraulic developments

Availability

Get in touch with us to get real-time availability for
Sel
Enquire
Month 1
Open
Unavailable
Month 2
Open
Unavailable
Month 3
Open
Unavailable
Month 4
Open
Unavailable
Month 5
Open
Unavailable
Month 6
Open
Unavailable

Day Rate

$
1350
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

8
years

Education

Bachelor of Engineering (Civil and Infrastructure) (Honours) at RMIT University

Qualifications

Rail Industry Worker
BEng

Software Familiarity

MS Project

References

Cale Frederiks
Project Manager
Coolstore Road LXR
Verified on
November 29, 2024
Damien Bergstrum
Project Leader
Coolstore Road LXR
Verified on
November 29, 2024

Day Rate

$
1350
/ day
This figure is indicative of a standard day rate, and in some cases can be negotiated depending on your requirements.

Industry Experience

8
years

Recent Activity

  • Booked at Dublin Road LXR for 3 months beginning 14th August as a Project Engineer
  • Extended to Coolstore Road LXR until the end of January 25 as a Project Engineer

About

Selman is a professional Engineer offering over 6 years of experience in delivering level crossing removal works and local/major road projects across Victoria.

Adaptable team-member, able to collaboratively develop a rapport with colleagues and excellent written/verbal communication skills. Selman holds a delivery record for a diverse portfolio of multiple projects as well as estimating experience and exceptional interface management between construction works and stakeholders.

Skills

Civil Engineering
Engineering design
Bulk excavation
Earthworks
FRP works
Temporary works
Staging & Methodology
Cost Estimating & Tendering

Sel

's Project Experience

Project Engineer | Sept 2024 - Jan 2025

Contract: SEPA (Laing O'Rourke) Dublin & Coolstore LXR 

Engaged to support the deliver of the civil's & roads packages for both Dublin and Coolstore rd LXR projects.

Project Engineer | April 2024 - July 2024

Contract: SRL (Burwood) Delcon Civil (Contract) 

Project Description:

  • High Risk Water and Sewer
  • Scope includes permanent works associated with water and sewer. Works include the mechanical excavation of shafts, installation of sewer using micro tunnelling method, install new maintenance holes, bypass existing sewer and make connections
  • Permanent works are also associated with the decommissioning of sewer and water assets

Role and responsibilities:

  • Part of the delivery and estimating team
  • Project estimating works for various projects utilising Excel and Expert
  • Delivery of water/sewer relocation and decommissioning works
  • Resource Management
  • Planning and sequencing construction activities
  • Design interaction - raising RFIs regarding design discrepancies
  • Cost tracking, budget analysis works and monthly forecasting
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance

Project Engineer | April 2023 to March 2024

South Dynon Train Maintenance Facility | Laing O’Rourke (Contract)

Project Description:

  • Upgrades to the South Dynon Train Maintenance Facility are increasing maintenance capacity and ensuring as much of the fleet as possible is available to deliver services.
  • The project consists of upgrading maintenance roads, infrastructure, and amenities at the site.

Role and responsibilities:

  • Part of both the delivery and interface team
  • Resource Management throughout Project(s) duration
  • Managing Piling subcontractor
  • Managing CSR Subcontractor
  • Planning and sequencing construction activities
  • Design interaction - raising RFIs regarding design discrepancies
  • Cost tracking and budget analysis works
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance
  • Interface responsibilities included the interaction between the client and West Gate Tunnel
  • Project to coordinate interface scope of works on a daily basis

Site Engineer | November 2022 to April 2023

Pound Road West Upgrade | Seymour Whyte (Contract)

Project Description:

The Pound Road West upgrade is part of the broader $3.4 billion Suburban Roads Upgrade – South Eastern and Northern Roads project. The project is jointly funded by the Federal Government ($1.14 billion) and the State Government ($2.27 billion). Pound Road West upgrade project in Melbourne is set to improve access in and around the Dandenong South employment hub.

The project comprises of the following:
- 2km Pound Road West duplication (connection between Abbotts Road and South Gippsland Highway)
- Modification of two existing traffic signalised intersections and construction of two new signalised intersections
- Construction of new shared walking and cycling paths

Role and responsibilities:

  • Predominantly part of the delivery team for multiple road occupation works
  • Procurement and Resource Management throughout Project(s) duration
  • Managing subcontractors and client representatives
  • Planning and sequencing construction activities
  • Design interaction - raising RFIs regarding design discrepancies
  • Cost tracking and budget analysis works
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance

Site Engineer / April 2022 – November 2022

John Holland (Contract) 

Project Description:

North West Program Alliance (NWPA) – Preston Level Crossing Removal Project (Civil Team)

  • The Level Crossing Removal Program (LXRP) is one of the Victorian Government's key transport infrastructure projects. Part of an overarching policy to improve Melbourne's transport network, its stated aim is to remove 50 of the most dangerous and congested level crossings in Melbourne with an overall budget of $8.3 billion. The Preston level crossings at Murray Road, Cramer Street, Bell Street and Oakover Road, were
    removed by raising the Mernda rail line over the roads

North West Program Alliance (NWPA) – Preston Level Crossing Removal Project (Civil Team)

Project Description:

  • The Level Crossing Removal Program (LXRP) is one of the Victorian Government's key transport infrastructure projects. Part of an overarching policy to improve Melbourne's transport network, its stated aim is to remove 50 of the most dangerous and congested level crossings in Melbourne with an overall budget of $8.3 billion. The Preston level crossings at Murray Road, Cramer Street, Bell Street and Oakover Road, were removed by raising the Mernda rail line over the roads

Role and responsibilities:

  • Working within the civil team to deliver scopes including formations, retaining walls, roadworks and carparks
  • Construction and interface coordination with structural and landscaping teams
  • Procurement and Resource Management throughout Project(s) duration
  • ITP review and implementation, closing lots and punch lists
  • Raising RFIs regarding design discrepancies
  • Conducted weekly environmental, safety and traffic audits
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance

Site Engineer / January 2022 – April 2022

Hopper Crossing Level Crossing Removal | McConnell Dowell (Contract) 

Project Description:
Western Program Alliance (WPA) – Old Geelong Road, Hoppers Crossing Level Crossing Removal Project (Carpark construction, service installations at structure interface, major road intersection upgrade)

  • The $355.5 million package saw two dangerous level crossings removed in Melbourne’s west. This was followed by the creation of a road bridge near the Old Geelong Road level crossing in Hoppers Crossing and a rail bridge over the Werribee Street level crossing in Werribee

Role and responsibilities:

  • Managing civil and road works in the northern precinct area (OGR1) at the interface of the newly developed pedestrian bridge
  • Construction and coordination with structural teams
  • Planning, programming and developing construction execution strategies for multiple work packages
  • Managing a team consisting of supervisors and graduate engineers
  • Liaising with subcontractors, DOT and City West Water
  • Procurement and Resource Management throughout Project(s) duration
  • ITP review and implementation, closing lots and punch lists
  • Raising IRFIs regarding design discrepancies
  • Conducted weekly environmental, safety and traffic audits
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance

Project Engineer / January 2021 – January 2022

AMG Civil Group (Full time) 

Project Description:

  • Multiple Subdivision Projects with individual budgets up to $9M, totalling in excess of $15M per annum

Role and responsibilities:

  • Developing Construction Management Plan, and correlating HSEQ documentation
  • Implementing relevant governing authority specifications and/or standard drawings
  • Reviewing design drawings and performing all necessary take-offs
  • Procurement and Resource Management throughout Project(s) duration
  • Developing Project construction programmes via Gantter and MS Project
  • Conducting weekly safety audits
  • Monitoring and tracking daily construction tasks, including subsequent cost tracking
  • Reviewing and certifying monthly subcontractor claims
  • Liaising with design engineers and clients to ensure all Project requirements are met
  • Completing monthly progress claims for consulting engineers

Project Engineer / July 2020 – November 2020

Civilink (Full time) 

Project Description:

Western Roads Upgrade - Project 3: Derrimut Road Upgrade

  • Multiple subdivision projects: Managing individual Projects with budgets up to $5M, totalling in excess of $12M per annum

Role and responsibilities:

  • Reviewed design drawings and performed all necessary take-offs
  • Developed fortnightly MS Excel programmes, from baseline programme provided by management
  • Developed various construction methodologies and safety documentation
  • Prepared Risk and Occupational Health and Safety registers
  • Prepared Request for Tender documentation
  • Prepared Purchase Orders and Subcontract Agreements
  • Liaised with Resource Manager to on-board and deliver necessary equipment, machinery and plant
  • Coordinated and planned construction activities to ensure the most efficient use of resources
  • Conducted weekly environmental, safety and traffic audits
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance

Site Engineer / February 2018– July 2020

Winslow Constructors (Full time) 

Project Description:

  • Multiple Subdivision Projects with individual budgets up to $19M, totalling in excess of $25M per annum

Role and responsibilities:

  • Reported to various Project Managers, across numerous Projects around Melbourne
  • Reviewed design drawings and performed all necessary take-offs
  • Developed various construction methodologies and safety documentation
  • Conducted weekly environmental, safety and traffic audits
  • Inspected works throughout the Project duration, to ensure the adherence of Quality Assurance

Associate Technical Drafter / June 2016– August 2016

KBR (Full time)

Role and responsibilities:

  • Acted as a Draftsman on the CSR Slab for McKinnon Road Level Crossing Removal Project
  • Contributed to the bridge design at McKinnon, Ormond and Bentleigh Stations
  • Assisted engineers with certain requirements in reference to drafting needs
  • Developed drawings that comply to Australian Engineering Standards
  • Utilised various design programs, including AutoCAD & Micro Station

Work Experience / June 2011 – July 2011

Abi Group (LendLease)

Role and responsibilities:

  • Various site visits including bridge developments and Wyndham City Council drainage instalments in Truganina
  • Office work: answering phone enquiries, installing computer programs and data work involving on-site profiles
  • On-site work: observing pipeline drainage instalments, various construction sites, bridge hydraulic developments